Operation
3A3111 A
11
11. Close resin dump valve (C).
12. Open hydraulic valve (E) to build pressure on Resin
(2000-2500psi).
13. Open material supply lever (B) on mix manifold.
14. Reverse tip on the spray gun.
a. Engage the trigger lock.
b. Rotate tip to the spray position.
c. Disengage the trigger lock.
ti26701a
Содержание 17G589
Страница 25: ...Notes 3A3111 A 25 Notes ...