Commissioning, Startup, Operation, and Shutdown
Model 3410 Installation, Operation, and Maintenance Manual
39
1. Remove the oiler.
1. Oiler
2. Adjustment assembly
3. Housing
2. Remove the adjustment assembly from the oiler.
3. Adjust the bars to dimension A as specified in
Bar adjustment
(page 39).
4. Lock in position.
5. Replace the adjustment assembly in the oiler.
6. Install the oiler.
7. Fill each bottle with oil and replace in the oiler housing.
The oil reservoir in the bearing housing is filled when the oil remains visible in the bottle.
You will need to fill the bottle several times.
Bar adjustment
Specification
Measurement
Dimension A
9/16 in. (14.5 mm)
Dimension B
1/2 in. (13 mm)
Oiler size
#5 8 oz (204 ml)
Casing capacity
• S and M groups: 9 oz (266 ml)
• L and XL groups: 16.5 oz (489 ml)
Seal the shaft with a packed stuffing box
NOTICE:
Packed stuffing boxes are not allowed in an ATEX-classified environment.
1. Make sure the stuffing box is clean and contains no foreign material.
2. Install the gland studs into the casing if they are not already installed.
The stuffing box packing is furnished in the box of fittings that accompanies the pump.
When you are packing the stuffing box, use the following order for the packing and lantern
rings:
1. Two packing rings
2. Lantern ring
Содержание 3410
Страница 1: ...Installation Operation and Maintenance Manual Model 3410 ...
Страница 2: ......
Страница 5: ...Table of Contents Model 3410 Installation Operation and Maintenance Manual 3 Parts list 75 ...
Страница 79: ......