TABLE OF CONTENTS
Safety Guidelines……………………………………….......……...........................Pages 4-7
Leveling Fort, General Information and Definitions…………………...................Pages 7-9
How to Install T-nuts, Board Identification, Predrill Lag Screw Directions and
Swing Beam Loading......................................................................................Pages 10-14
Site Plan, Required Tool List and Kit Contents...............................................Pages 15-16
Hardware, Lumber and Accessory Checklists.………………………………....Pages 17-49
Adding T-Nuts to Lower Level Corner Posts....…………………..………...…........... Step 1
Framing Lower Level Fort……………………..…………………………..……..... Steps 2-12
Mounting Deck…………………………....……………….…………...…................... Step 13
Rock Wall Assembly/Installation…………………...…..……..……...….…….... Steps 14-18
Ladder Assembly/Installation………………..……........................................... Steps 19-20
Adding T-Nuts to Upper Level Corner Posts......................................................... Step 21
Framing Upper Level Deck............................................................................. Steps 22-31
Mounting Upper Level Deck........................................................................... Steps 32-37
Assembling and attaching Rad Ride Tube Slide................................................... Step 38
Rear Bottom Panel Board, Rear Center Post................................................. Steps 39-40
Upper Level Panel Slats........................................................................................ Step 41
Lower Level Front Center Post.............................................................................. Step 42
Upper Level Steps................................................................................................. Step 43
Lower Level Panel Slats........................................................................................ Step 44
Swing Beam Assembly…………….……………………..……........….............. Steps 45-52
Wood Roof Assemblies...................................…….....……………………..…. Steps 53-64
Safety Boards……………………………………………........................................... Step 65
Picnic Table Assembly and Installation..…………………………......….…....... Steps 66-68
Sandbox Seats/Name Plate.................................................................................. Step 69
Tic Tac Toe Assembly/Installation………………………………..……............... Steps 70-71
2
Содержание 1500IWF
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 42: ...2 125 6 1000 RPS 5 4 X 6 X 10 ROOF PEAK SUPPORT DESCRIPTION PICTURE QTY 32 ...
Страница 53: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 07 0031 1 1 PLASTIC DORMER SUNBURST 2 DESCRIPTION PICTURE QTY 43 ...
Страница 140: ...PART II CLATTER BRIDGE 130 ...
Страница 169: ...APPENDIX 159 ...
Страница 171: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 172: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 173: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...