Refrigerant Line Connections

NOTICE

THIS UNIT IS SHIPPED WITH A NITROGEN/HELIUM 
HOLDING CHARGE ONLY.  UNIT MUST BE 
EVACUATED AND CHARGED PER INSTALLATION 
INSTRUCTIONS WITH REFRIGERANT LISTED ON 
SERIAL RATING PLATE.

NOTE:

 Holding charge must be removed before brazing.  Open

service valves slowly to remove holding charge.  Close valves
before brazing to prevent contaminants from entering system.

IMPORTANT

: To avoid overheating the service valve, TXV

valve, or filter drier while brazing, wrap the component
with a wet rag, or use a thermal heat trap compound as
recommended by the compound manufacturer.  Use a
brazing alloy of 2% minimum silver content.  Do not use
flux.

1. The ends of the refrigerant lines must be cut square, de-

burred, cleaned, and be round and free from nicks or dents.
Any other condition increases the chance of a refrigerant
leak.

2. “Sweep” the refrigerant line with nitrogen or inert gas dur-

ing brazing to prevent the formation of copper-oxide in-
side the refrigerant lines.

3. After brazing, quench the joints with water or a wet cloth

to prevent overheating of the service valve.

4. Ensure the filter drier paint finish is intact after brazing.  If

the paint of the steel filter drier has been burned or chipped,
repaint or treat with a rust preventative.  This is especially
important on suction line filter driers which are continu-
ally wet when the unit is operating.

NOTE: 

 Be careful not to kink or dent refrigerant lines.  Kinked

or dented lines will cause poor performance or compressor
damage.

Do NOT make final refrigerant line connection until plugs are
removed from refrigerant tubing.

NOTE:  

Before brazing, verify indoor piston size by checking

the piston kit chart packaged with indoor unit.

Leak Testing (Nitrogen or Nitrogen-Traced)

To avoid the risk of fire or explosion, never use
oxygen, high pressure air or flammable gases for leak
testing of a refrigeration system.

WARNING

To avoid possible explosion, the line from the
nitrogen cylinder must include a pressure regulator
and a pressure relief valve. The pressure relief valve
must be set to open at no more than 150 psig.

WARNING

Pressure test the system using dry nitrogen and soapy water
to locate leaks.  If you wish to use a leak detector, charge the
system to 10 psi using the appropriate refrigerant then use
nitrogen to finish charging the system to working pressure then
apply the detector to suspect areas. If leaks are found, repair
them. After repair, repeat the pressure test. If no leaks exist,
proceed to system evacuation.

System Evacuation

Condensing unit liquid and suction valves are closed to contain
the charge within the unit.  The unit is shipped with the valve
stems closed and caps installed.

REFRIGERANT UNDER PRESSURE!

 

Failure to follow proper procedures may cause 
property damage, personal injury or death.

WARNING

NOTICE

THIS UNIT IS SHIPPED WITH A NITROGEN/HELIUM 
HOLDING CHARGE ONLY.  UNIT MUST BE 
EVACUATED AND CHARGED PER INSTALLATION 
INSTRUCTIONS WITH REFRIGERANT LISTED ON 
SERIAL RATING PLATE.

UNITS SHIPPED WITH A HOLDING CHARGE ARE
INTENDED FOR COMPONENT REPLACEMENT 
ONLY ON EXISTING SYSTEMS, AND NOT 
INTENDED FOR USE IN NEW SYSTEMS OR NEWLY
CONSTRUCTED HOMES.

NOTICE

NOTICE

UNITS MUST ONLY BE USED AS REPLACEMENT
COMPONENTS FOR PRE-2010 INSTALLED
SYSTEMS.

NOTE:

 Holding charge must be removed before brazing.

1. Openservice valves before attaching vacuum pump.

2. Connect the vacuum pump with 250 micron capability to

the service valves.

3. Evacuate the system to 250 microns or less using suc-

tion 

and

 liquid service valves.  Using both valves is nec-

essary as some compressors create a mechanical seal
separating the sides of the system.

4. Close pump valve and hold vacuum for 10 minutes.  Typi-

cally pressure will rise during this period.

Содержание CONDENSING AC UNIT

Страница 1: ...s no responsibility for equip ment installed in violation of any codes or regulations The United States Environmental Protection Agency EPA has issued various regulations regarding the introduc tion and disposal of refrigerants Failure to follow these regulations may harm the environment and can lead to the imposition of substantial fines Should you have any questions please contact the local offi...

Страница 2: ...rant used Store cylinders in a cool dry place Never use a cy linder as a platform or a roller Another important consideration in selecting a location for the unit s is the angle to obstructions Either side adjacent the valves can be placed toward the structure provided the side away from the structure maintains minimum service clearance Corner installations are strongly discouraged 12 12 60 24 Thi...

Страница 3: ... type hanger Keep both lines separate and always insulate the suction line Suct Liq Suct Liq Suct Liq 7 1 2 1 1 8 5 8 1 3 8 5 8 1 3 8 5 8 10 1 3 8 5 8 1 5 8 5 8 1 5 8 5 8 Cond Unit Tons REFRIGERANT LINE LENGTH ft 0 24 25 49 50 74 Line Diameter In OD Full rating line size Lines greater than 74 feet in length or vertical elevation changes more than 50 feet refer to the Remote Cooling Service Manual ...

Страница 4: ...isk of fire or explosion never use oxygen high pressure air or flammable gases for leak testing of a refrigeration system WARNING To avoid possible explosion the line from the nitrogen cylinder must include a pressure regulator and a pressure relief valve The pressure relief valve must be set to open at no more than 150 psig WARNING Pressure test the system using dry nitrogen and soapy water to lo...

Страница 5: ... NOTICE Units with reciprocating compressors and non bleed TXV s require a Hard Start Kit This unit is designed for three phase operation DO NOT OP ERATE ON A SINGLE PHASE POWER SUPPLY Measure the power supply to the unit The supply voltage must be in agreement with the unit rating plate power requirements RATED VOLTAGE MINIMUM SUPPLY VOLTAGE MAXIMUM SUPPLY VOLTAGE 208 230V 197 253 460V 414 506 Th...

Страница 6: ...e Compressor Rotation Use care when handling scroll compressors Dome temp eratures could be hot CAUTION Three phase scrolls are power phase dependent and can com press in more than one direction Verify proper rotation for three phase compressors by ensuring the suction pressure drops and discharge pressure rises when the compressor is energized NOTE When operated in re verse a three phase scroll c...

Страница 7: ...p plication should have a subcooling of 11 2 ºF and su perheat of 9 1 ºF a If subcooling and superheat are low adjust TXV to 9 1 ºF superheat then check subcooling NOTE To adjust superheat turn the valve stem clock wise to increase and counter clockwise to decrease b If subcooling is low and superheat is high add charge to raise subcooling to 11 2ºF then check superheat c If subcooling and superhe...

Страница 8: ...oil Clean or replace filters 7 Flash gas in the liquid line 7 Excessive liquid line drop Check liquid line size 8 Quantity of air through evaporator not adequate 8 Increase the blower speed 1 Expansion valve stuck open 1 Correct valve action or replace the valve 2 Expansion valve bulb not in contact with 2 Fasten bulb securely to suction line suction line 3 Suction and or discharge valve leaking o...

Отзывы: