62
- Chapter 12 - Optional Accessories
Windrow 2500L Operator’s Manual MY18 - REV 1
Auto Rate Control - Spray Application
After completing the filling process, you are now
ready to start spraying. While travelling from the fill
station to the field, the pump should be running at
400 - 500 rpm with the agitator running in order to
ensure that the chemical mix is adequately agitated
prior to spraying.
NOTE:
The following information is provided as a
guide only. It is the responsibility of the operator to
assess the conditions in the field where the spray
application is taking place
NOTE:
The bypass ball valve must be open while
spraying.
1. Enter the field, unfold boom and set the boom to
desired height above the target and have pump
running.
2. Switch on the console and set to run in self test
mode (while stationary). Information on running
in self test mode can be found in the Raven
operator’s manual supplied.
3. Turn on all boom sections
4. Remain stationary until all boom lines have been
completely purged with product from the main
tank.
5. Switch off all boom sections.
6. Commence travel on primary swathe and engage
boom master switch. Auto rate controller will
now control application based on the calibration
information entered by the operator.
7. To avoid overlap it is recommended that
individual boom section switches are used to turn
on/off sections as needed.
8. Upon completing the spray task, the booms
and pump should be flushed after spraying. See
‘Flushing’ section later in this chapter.
Содержание Windrow MY18 2500L
Страница 4: ......
Страница 6: ...Auto Rate Control Raven SCS 450 61 Auto Rate Control Spray Application 62 Engine 63 ...
Страница 8: ...Windrow 2500L Operator s Manual MY18 REV 1 2 Chapter 1 Introduction ...
Страница 18: ...12 Chapter 4 5 N A Windrow 2500L Operator s Manual MY18 REV 1 ...
Страница 26: ...20 Chapter 6 Calibration Windrow 2500L Operator s Manual MY18 REV 1 ...
Страница 31: ...Chapter 7 Pre Operation 25 Windrow 2500L Operator s Manual MY18 REV 1 Wiring Schematic Raven SCS450 ...
Страница 32: ...26 Chapter 7 Pre Operation Windrow 2500L Operator s Manual MY18 REV 1 Wiring Schematic Manual Rate Control ...
Страница 48: ...42 Chapter 9 Booms Windrow 2500L Operator s Manual MY18 REV 1 ...
Страница 56: ...50 Chapter 10 Lubrication Maintenance Windrow 2500L Operator s Manual MY18 REV 1 ...
Страница 73: ...Chapter 12 Optional Accessories 67 Windrow 2500L Operator s Manual MY18 REV 1 ...
Страница 74: ...www goldacres com au ...