![GMP G 14.25 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/gmp/g-14-25/g-14-25_installation-manual_2236380006.webp)
6
G
Line - INSTALLATION MANUAL
TRANSPORT | UNLOADING | UNPACKING
INSPECTION
When ironer is delivered, visually inspect the packing and the parts of the ironer visible through the packing.
Before signing any delivery document to the forwarder, make sure the product is delivered intact.
UNLOADING
The ironer must be unloaded from truck and transported keeping forklift forks as wide apart as possible to avoid any
torsion to the frame.
In case an unloading with crane is necessary, a balancer should be used to ensure the machine frame remains level during
the handling.
IMPORTANT!
To avoid damaging the appliance, do not let it drop when handling.
DANGER!
Remember the center of gravity is high: machine should therefore be handled with extreme precaution, since shocks might
cause it to fall.
UNPACKING
Keep all packing (plastic bags, polystyrene foam, nails, screws, metal or plastic straps, etc.) out of reach of children and
dispose of suitably, as they are potential sources of danger and pollution.
All packing parts are completely recyclable, so a separate waste sorting should be used whenever possible.
CENTRE OF GRAVITY