Step 1: Determine the location for installation (Make sure all ADA requirements are
met)
Step 2: Make sure that all the parts are present (Refer to the parts list)
1 - Anchor Sleeve w/ Base
1 - Binding Screw
1 - Plastic Cap
Step 3: At the determined location for installation, chalk out a 3’ X 3’ area prior to
cutting out the concrete. (Refer to overview, the front end of the Anchor Sleeve
must be
12” to 36” from
the
water’s edge or 13” min if an obstacle is present before
the water and 6
” deep). New Construction, the concrete must be 6” deep with a ½”
reinforcing rod, minimum of an 18” grid.
NOTE: Make sure that all local codes and ordinances are met.
Step 4: Once the
3’
X
3’
area is cut out, make sure you drill in the inner wall of all 4
sides of the area (refer to the section detail) for the purpose of cold pinning the new
concrete to the old concrete. Use 1/2” rebar, 6” to 8” in length.
INSTALLATION STEPS R-450A
FEB 2012
New Construction/ Saw Cut Sleeve
Anchor R-450A
Содержание Rotational R-450A
Страница 16: ...ANCHORING SLEEVE BASE PLATE BINDING SCREW R 450A FEB 2012 New Construction Saw Cut Sleeve Anchor R 450A ...
Страница 29: ...GLOBAL LIFT CORP INSTALLATION MANUAL Out of Box R Series Lifts Series Lifts ...
Страница 34: ...GLOBAL LIFT CORP INSTALLATION MANUAL Out of Crate R Series R 450A Lifts Series Lifts ...
Страница 38: ...GLOBAL LIFT CORP CUSTOM SEAT INSTALLATION MANUAL R Series Lifts Series Lifts ...