Step 5: Place the Anchor Sleeve in the cut out area, make sure that the front of the Anchor
Sleeve is
12” (min) to 24” (max) from
the
water’s edge or if an obstacle is present before the
water. (refer to overview) A key element is to make sure that the Anchor Sleeve is level and
square with the pool so that your Rotational Series Lift sits properly on the deck.
NOTE: The lift will reach 36” from the anchor and clear an 48” obstacle. If
you place the anchor sleeve 12” from the pools edge or 13” min if an
obstacle is present before the water, the lift will reach 24” out into the
water.
Step 7: Bonding the unit
–
The binding screw is supplied with the Anchor Sleeve, locate the
binding screw, connect the binding screw to the bonding grid.
NOTE: Make sure that all local codes and ordinances are met.
Step 8: Pour in your concrete, (make sure you cover the hole on your anchor sleeve with the
plastic cap provided,
so you don’t get concrete in the
sleeve) a minimum of 4,000 psi concrete
with reinforcing rod. Also make sure that the top of the anchor sleeve is flush with the deck.
Before you install your lift make sure you let the concrete set up for 48 hours.
Step 9: After the concrete has set for 48 hours, now it’s time to install your lift. Place your
Rotational Series Lift over the anchor sleeve, once you have completed the installation, please
refer to User’s Manual for a safe operation.
FEB 2012
New Construction/ Saw Cut Sleeve
Anchor R-450A
Содержание Rotational R-450A
Страница 16: ...ANCHORING SLEEVE BASE PLATE BINDING SCREW R 450A FEB 2012 New Construction Saw Cut Sleeve Anchor R 450A ...
Страница 29: ...GLOBAL LIFT CORP INSTALLATION MANUAL Out of Box R Series Lifts Series Lifts ...
Страница 34: ...GLOBAL LIFT CORP INSTALLATION MANUAL Out of Crate R Series R 450A Lifts Series Lifts ...
Страница 38: ...GLOBAL LIFT CORP CUSTOM SEAT INSTALLATION MANUAL R Series Lifts Series Lifts ...