•Page
globalcontract.com
4
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Post Base Covers
STEP 1: Slide Post Base Cover into bottom of Universal Corner Post.
STEP 2: Secure into place on 2 sides, with two small black screws.
Electrical - Adding Power Distribution Housing
Align Power Distribution Housing so the bottoms tabs drop into the pre-cut slots in the
panel base. Be sure to align the spring clips on top, so they are facing you.
Rotate Power Distribution Harness into place until the spring snap securely into
place.
Included cable managers can be slid to the side, or removed.
2
1