•Page
globalcontract.com
10
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Centre Mounted Overhead
1. Install the corner brackets so they align with the very top of the panel.
2. Measure and centre the overhead on top of the panel.
3. While someone holds it in place, fasten the overhead to the brackets with the
provided screws.
1
1
2
3