
•Page
globalcontract.com
6
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
STEP 1: Disconnect clamp at top of ceiling feed, and remove, tape the wires together.
STEP 2: Lay the Universal Corner Post on the fl oor. Slide top of ceiling feed
through Universal Corner Post, starting at the bottom of the post.
STEP 3: Lay Post Extension inline with the Universal Corner Post. Slide Ceiling
Feed through the Post Extension. Attach Post Extension connector plates as
indicated in Post Extension instructions, on this page, below.
STEP4: Reattach connector clamp to top of ceiling feed. Install completed Power
Pole onto panels, and into ceiling.
* THESE ARE GUIDELINES ONLY, ACTUAL NUMBERS MAY VARY BASED ON SITE
CONDITIONS AND CLIENT REQUIREMENTS *
With Power
Pass Through Cable
Power Feed
(0.73” dia)
Post
Panel Frame
Without Power
Pass Through Cable
25x CAT6 Cables
0.25” dia
20x CAT6 Cables
0.25” dia
Post
Panel Frame
Typical application, recommended maximum
Electrical - Ceiling Feed
Electrical - 90 degree post cable capacity
Post Extension
STEP 1: Drill a 6mm hole, screw bottom of attachment plates into universal
corner post. Use two plates, opposite to each other for each post extension.
STEP 2: Slide Post Extension Post between attachment plates.
STEP 3: Drill a 6mm hole. Screw top of attachment plates into post extension.
STEP 4: Snap Trims into grooves on all 4 sides of Post Extension. Trim dimension
matches post dimension.
1
1
2
3
4
2
• Summer 2017 rev:Winter 2018