![background image](http://html1.mh-extra.com/html/global-contract/compile/compile_installation-manual_2232714019.webp)
•Page
globalcontract.com
18
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
End Panel
STEP 1: Align the holes of the
worksurface brackets (1)
with the pilot holes (2)
on the top of the
end panel (3)
. Drive the supplied screws into the end panel but
do not over tighten.
STEP 2: Attached the
panel mounting brackets (4)
to the end panel, while align-
ing the bracket holes with the pilot holes of the end panel.
STEP 3: Attach the end panel to the Compile panel’s vertical rail (5). Put it on an
angle then rotate it into its place.
STEP 4: Adjust the levelers as needed, making sure the end panel will keep the
worksurface level.
STEP 5: Proceed with the installation of the worksurfaces.
Installation Tip: Identify correct setting
of worksurface mounting brackets (left
and right, single or supporting adjacent
worksurface) and install the panel
mounting bracket accordingly.
4
2
2
1
1
3
5