INSTALLATION GUIDELINES
ADA Overhead
Mid Run Panel Removal & Top Horizontal Replacement
STEP 1: Slide down the supplied 2 - two hole sliders into the side groves of the
panel to their position using a gauge. Typical installation is 15” from the top of
the panel.
STEP 2: Slide the ADA from top down until you meet with the 2 hole sliders
already installed.
STEP 1: Insert the crowbar under the bottom of the vertical and lift until the con-
nectors at the top disengage.
STEP 2: Repeat the above step and release the panel from the row.
STEP 3: Screw out the two screws (each side) and release the top horizontal.
Replace with the new top horizontal.
STEP 4: Drop down one side of the panel then drop down the following side into
the connectors. (Use clamp vise grips to bring the panels close to each other
while the drop down panel is raised above the connectors.)