202-INST-US-001 v1.0 

 11 Dec 2020 

 

Need assistance? 833-SKYDOOR (833-759-3667) [email protected] 

Page 6 of 25 

Pre-Installation Preparation 

 

 

These products can be very heavy. Due consideration should be given to getting the product onto the roof safely and 
extreme care taken during installation. 

 

Points to Note Prior to Commencing Installation 

1.

 

The  Pitchvent  should  arrive  on  site  in  undamaged  packaging,  which  includes  a  wooden  build  frame/blocks,  cardboard, 
polyfoam glass protection and low tack tape. Please inspect for damage to packaging and/or product and advise Glazing Vision 
of any damage or shortfall within 48 hours from signing the receipt of your delivery. 

 
2.

 

Enclosed within the box containing this manual will be the required number of fixing woodscrews and a number of plastic 
packers, as well as some silicone and other required materials. The installation kit is supplied with a control switch (Chain 
Actuated Pitchvents only), a  Power Supply Unit  (PSU 

 Chain Actuated Pitchvents only) and any additional optional  items 

selected at the time of order. 

 

Standard Installation Hardware 

Enclosed within the hardware box for each unit you should find at least the following: 

 

Stainless steel woodscrews 

 

Plastic horseshoe packers 

 

(various sizes) 

 

Low modulus silicone 

 

Butyl tape 

 

(

1/4”

 diameter) 

 

Flashing Kit 

If a flashing kit has been specified, the following items should also be included: 

 

Lead sheet 

 

Head flashing (5-

7/8”

 wide) 

Sill flashing (17-

3/4”

 wide) 

Lead for soakers (17-

3/4”

 wide) 

Roofing underlay 

 

Head apron (39-

3/8”

 wide) 

Jamb aprons (39-

3/8”

 wide) 

Butyl tape 

 

(

2”

 wide) 

 

3.

 

Chain Actuated Pitchvents have two coiled cables emerging from the motor housing as standard (if optional extras have been 
selected, other cables may also be present). This includes 2 single cores (red and black) 24V DC power cables and a 6 core 
control cable. These cables will have identification labels on them (labels should not be removed until final installation). Please 

refer to Glazing Vision’s wiring diagrams for details of wiring requiremen

ts. Only the supplied PSU can be fitted to the unit, 

failure to connect this unit or wiring direct to the main power supply will invalidate the product warranty. 
 

Содержание Pitchvent

Страница 1: ...202 INST US 001 v1 0 11 Dec 2020 www glazingvision com 833 SKYDOOR 833 759 3667 sales glazingvision com Pitchvent...

Страница 2: ...les glazingvision com Page 2 of 25 Contents Section Description Page Introduction 3 Safety Information 4 Pre Installation Preparation 6 Preparation of the Roof 8 Installation Procedure 11 Chain Actuat...

Страница 3: ...d that an installation by non approved installers will result in a reduced warranty period of just 2 years By following the correct installation procedure a reliable and high performing end result is...

Страница 4: ...n If specialist access or equipment is required e g a fall arrest system What personal protective safety equipment PPE is required for working at height e g harness Methods for safe working for exampl...

Страница 5: ...for this product in a considerate manner Cardboard and wood items are widely recycled Electrical Works Cables It is recommended that electrical work is carried out by a qualified and competent electri...

Страница 6: ...tchvents only and any additional optional items selected at the time of order Standard Installation Hardware Enclosed within the hardware box for each unit you should find at least the following Stain...

Страница 7: ...be clear to provide safe access during the installation works It will be necessary to work on the outside and therefore suitable provisions should be made for safe handling of the product including al...

Страница 8: ...hen designing the size of the aperture Figure A is for illustrative purposes only and may not be suitable for your installation These products can be very heavy Glazing Vision strongly recommends that...

Страница 9: ...nken frame Figure B is for illustrative purposes only and may not be suitable for your installation These products can be very heavy Glazing Vision strongly recommends that a structural engineer is co...

Страница 10: ...nly and may not be suitable for your installation These products can be very heavy Glazing Vision strongly recommends that a structural engineer is consulted when designing the structure s that will s...

Страница 11: ...ave read and understood the entire installation instructions section before starting The surrounding roof should not yet be felted or battened this will be covered in the installation instructions Pri...

Страница 12: ...ag over time allowing water to pool or even to run underneath the tiling to the sides of the product Step 3 Prepare and Install the Sill Flashing Using either the sill flashing supplied as part of the...

Страница 13: ...the product including polyfoam glass protection and low tack tape When removing the packaging try to keep it intact as much as possible so that after installation it can be re used to protect the prod...

Страница 14: ...ealants it adheres to the supporting structure making repositioning difficult Once satisfied that everything is correctly positioned carefully release the weight of the product Remove the crane and li...

Страница 15: ...s Run a continuous thick fillet of silicone supplied along the entire length of the head the sill and both jambs Figure 5 Head sill and jambs siliconed Whilst still wet excess silicone can be cleaned...

Страница 16: ...n use the roofing underlay supplied as part of the flashing kit if specified otherwise use roofing underlay of at least 39 3 8 in width The aprons should be at least 5 7 8 longer than the external spa...

Страница 17: ...o the head gutter of the product The purpose of the tilting fillet is to support the apron and flashing at the head of the product Lead used for flashing must be supported or it will sag over time all...

Страница 18: ...on should lap over the head flashing by at least 2 and the top edge should lap under the underlay of the roof by at least 2 If the underlay supplied recommended does not reach then a second piece shou...

Страница 19: ...part of the flashing kit if specified otherwise use 0 042 thick flashing lead fit the lead soakers The soakers should tuck approximately 4 between the tiles slates should fold under the gutter of the...

Страница 20: ...al position Figure 13a Sill tiled and sill flashing finished Tile to either side of the product installing the soakers as you go Figure 13b Jambs tiled and soakers installed Tile above the product Gla...

Страница 21: ...ions preventing the lid from moving freely e g scaffolding or loads placed on the lid Check also that the product s mechanisms are properly engaged i e the manual override procedure has not been carri...

Страница 22: ...late from the sill Figure 14a Transportation bracket removed Attach the base bracket and spacer supplied to the base frame of the product using the supplied screws ensure that the bracket is correctly...

Страница 23: ...ing the spindle to the frame bracket this is essential as the glass will be in the way Making sure that the shoulder of the spindle sits hard against the collar unscrew a small length of the inner spi...

Страница 24: ...ner part of the spindle Figure 14g Spindle attached to lid bracket Once set up is complete check the product Open and close the lid to check and make sure the lid closes with the spindle reaching the...

Страница 25: ...for example edging strips for plastering may touch any part of the product framework that is the outer color RAL 7015 grey as standard Any airspaces between the aluminum frame of the product and the i...

Отзывы: