55
Girard Systems
©
2005
G-2000 Warranty Labor Hour Guidelines
LABOR FUNCTION
FACTORY APPrOVED LABOR HOURS
Complete awning replacement, surface mount ………………………..
2 Hours
Complete awning replacement, recessed mounts ………………………
4 Hours
Fabric replacements, surface mounts …………………………………..
1 Hour
Fabric replacements, recessed mounts …………………………………
2 Hour
Motor replacements, surface mounts …………………………………..
2 Hours
Motor replacements, recessed mounts ………………………………….
3.5 Hours
Lateral arm replacement (per arm) ……………………………………..
1 Hour
Lead rail lateral adjustment …………………………………………….
20 Minutes
Lead rail replacement …………………………………………………..
2 Hours
Motor limit adjustment …………………………………………………
20 Minutes
Wind sensor anemometer replacement …………………………………
30 Minutes
ACL current limiter replacement ……………………………………….
30 Minutes
Wind sensor controller replacement ……………………………………
30 Minutes
Wind sensor controller re-programs …………………………………….
30 Minutes
Remote motor/remote switch/remote transmitter re-program………….
20 Minutes
Wind sensor wall switch replacement …………………………………...
20 Minutes
Rubber seal replacement.................................................................................
1 Hour
Totals are figured at flat rate compensation based upon applicable service rate per hours.
Authorization must be obtained before beginning repairs. Claims require parts to be returned prior too
payment. If components are found not defective there will be a 20% restocking fee. Warranty Guidelines
dose not cover breakage. All warrenty parts will be shipped FedEx ground. Contact Girard Systems –
Warranty with questions or concerns about labor hour’s guidelines or labor functions (800) 382-8442
Trouble-shooting guide
NOTE:
These tips are provided for informational purposes; we recommend that the adjustments
be made by an authorized service center. This guide will, however, allow you to become familiar
with your awning and provide you with adequate knowledge in the event of an emergency.
Problem
Lead rail is binding on side of awning casing (i.e., rail is offset from casing).
Содержание G-Link G-1500
Страница 1: ......
Страница 17: ...17 Girard Systems 2005 Figure 8 adjustment bolt ADJUSTING LEAD RAIL FIGURE 9 PITCH OF LEAD RAIL WHEN CLOSED...
Страница 35: ...35 Girard Systems 2005...
Страница 39: ...39 Girard Systems 2005 figure 24 MOUNTING AWNING TO WALL MOUNT BRACKETS...
Страница 45: ...45 Girard Systems 2005 Figure 30 G 2000 Automatic lateral arm awning system wiring diagram...
Страница 62: ...62 Girard Systems 2005...
Страница 63: ...63 Girard Systems 2005...
Страница 64: ...64 Girard Systems 2005...
Страница 65: ...65 Girard Systems 2005...