34
Girard Systems
©
2005
INSTALLATION SEQUENCE
4.5 hours (based on two installers)
K.
RV WALL MOUNT BRACKETS
1.
Wall mount brackets have been assembled to awning for shipping purposes. (See Fig. 19 for
quantities.)
2.
Remove the three (3) brackets from back of awning using a 5mm Allen wrench to loosen the
set screws (one on the bottom of each bracket). (See Fig. 18).
Figure 18
Slide Lock Removal from Bracket
Содержание G-Link G-1500
Страница 1: ......
Страница 17: ...17 Girard Systems 2005 Figure 8 adjustment bolt ADJUSTING LEAD RAIL FIGURE 9 PITCH OF LEAD RAIL WHEN CLOSED...
Страница 35: ...35 Girard Systems 2005...
Страница 39: ...39 Girard Systems 2005 figure 24 MOUNTING AWNING TO WALL MOUNT BRACKETS...
Страница 45: ...45 Girard Systems 2005 Figure 30 G 2000 Automatic lateral arm awning system wiring diagram...
Страница 62: ...62 Girard Systems 2005...
Страница 63: ...63 Girard Systems 2005...
Страница 64: ...64 Girard Systems 2005...
Страница 65: ...65 Girard Systems 2005...