32
Girard Systems
©
2005
TOOLS REQUIRED
√
Electric drill; 1/8", 5/16", 7/16" drill bits (for pilot hole - 1/8" x 8" long)
√
Open-ended wrenches: 10mm, 17mm, and 19mm
√
Allen wrenches: 4mm and 5mm
√
Socket wrench (7/16" deep socket)
√
Measuring tape
√
Snap (chalk ) line
√
Phillips screwdriver
√
Flathead screwdriver (small)
√
Keyhole saw
√
Two (2) tubes silicone
√
Two (2) ladders
ALL ELECTRICAL WORK MUST CONFORM TO
APPLICABLE ELECTRICAL CODES AND STANDARDS
Turn off power before beginning electrical work.
Refer to your RV’s wiring diagram for placement of existing wires before drilling
or beginning awning installation.
Be sure that placement of controls, cables, and/or wires does not impede, crimp,
or otherwise obstruct continuity of electrical current.
Prior to beginning installation sequence and while awning is on the ground, open awning approximately
eight inches (8") using hand crank to confirm awning arm location. (See Fig. 17)
Important Note:
When proceeding to Section K, note that each awning arm must have a wall mount
bracket directly behind it for proper mounting.
Содержание G-Link G-1500
Страница 1: ......
Страница 17: ...17 Girard Systems 2005 Figure 8 adjustment bolt ADJUSTING LEAD RAIL FIGURE 9 PITCH OF LEAD RAIL WHEN CLOSED...
Страница 35: ...35 Girard Systems 2005...
Страница 39: ...39 Girard Systems 2005 figure 24 MOUNTING AWNING TO WALL MOUNT BRACKETS...
Страница 45: ...45 Girard Systems 2005 Figure 30 G 2000 Automatic lateral arm awning system wiring diagram...
Страница 62: ...62 Girard Systems 2005...
Страница 63: ...63 Girard Systems 2005...
Страница 64: ...64 Girard Systems 2005...
Страница 65: ...65 Girard Systems 2005...