1.1.2
Items Furnished
In addition to options and/or accessories specifically ordered, items furnished with the
instrument are as follows:
1 ea. - Operation and Maintenance Manual
1 ea. - 6 ft. power cord
2 ea. - PC Extender Board
1 ea. - PC Card Extractor
1.1.3
Items Required
An IEEE-488 interface cable is needed for remote control operation. Appropriate RF output
cabling to fit the female type SMA output connector can be ordered as an Accessory Cable Kit,
No. A001.
1.1.4
Tools and Test Equipment
No special tools are required to operate the GT 9000. Test equipment required for calibration or
performance verification is described in Chapter 4.
1.1.5
Cooling
A cooling fan is installed in the instrument. The cooling air intake and exhaust are both located
on the rear panel. Care must be taken to avoid obstructing the flow of air into and out of the
instrument.
1.1.6
Cleaning
The air inlet screen should be cleaned whenever a significant amount of dirt or dust has
accumulated. Whenever the covers are removed, the interior should be blown out with dry air at
a low velocity.
1.1.7
Installation and Preparation for Use
The GT 9000 is shipped in operational condition and no special installation procedures are
required. A warm-up time of 20 minutes is recommended for normal operation (for warm-up
time prior to calibration and testing, see Chapter 4).
1.1.8
Receiving Inspection
Use care in removing the instrument from the carton and check immediately for physical
damage, such as bent or broken connectors on the front and rear panels, dents or scratches on
the panels, broken extractor handles, etc. Check the shipping carton for evidence of physical
damage and immediately report any damage to the shipping carrier.
When the instrument is received, check the carton for evidence of damage. If damage is found,
notify the carrier immediately, and open the carton only in the carrier’s presence.
Each Giga-tronics instrument must pass rigorous inspections and tests prior to shipment. Upon
receipt, it should immediately be subjected to a performance check to ensure that operation has not
been impaired during shipment. The performance verification procedure is described in Chapter 4 of
this manual.
Model GT 9000 Microwave Synthesizer
1-2
Manual No. 120AM00250, Rev C, September 1998
Содержание GT 9000
Страница 12: ...Series GT 9000 Microwave Synthesizers x Manual No 120AM00250 Rev C September 1998 ...
Страница 14: ...Series GT 9000 Microwave Synthesizers xii Manual No 120AM00250 Rev C September 1998 ...
Страница 18: ...Series GT 9000 Microwave Synthesizers xvi Manual No 120AM00250 Rev C September 1998 ...
Страница 20: ...Series GT 9000 Microwave Synthesizers xviii Manual No 120AM00250 Rev C September 1998 ...
Страница 94: ...Model GT 9000 Microwave Synthesizer 3 36 Manual No 120AM00250 Rev C September 1998 ...
Страница 122: ...Model GT 9000 Microwave Synthesizer 4 28 Manual No 120AM00250 Rev C September 1998 ...
Страница 129: ...6 Check the level control circuit see Section 5 3 7 Maintenance Manual No 120AM00250 Rev C September 1998 5 3 ...
Страница 142: ...Model GT 9000 Microwave Synthesizer 5 16 Manual No 120AM00250 Rev C September 1998 ...
Страница 198: ...Model GT 9000 Microwave Synthesizer 6 56 Manual No 120AM00250 Rev C September 1998 ...
Страница 206: ...Model GT 9000 Microwave Synthesizers 7 2 Manual No 120AM00250 Rev C September 1998 ...
Страница 232: ...Model GT 9000 Microwave Synthesizer A 26 Manual No 120AM00250 Rev C September 1998 ...
Страница 238: ...Model GT 9000 Microwave Synthesizer Index 6 Manual No 120AM00250 Rev C September 1998 ...