Giant Factories InnoFlue Centrotherm Скачать руководство пользователя страница 5

5

4

According to the CAN/CSA-B149, Natural Gas and Propane 

Installation Code, plastic vent systems installed in Canada 

must be certified to the STANDARD FOR TYPE BH GAS 

VENTING SYSTEMS, ULC S636. Components of the certi-

fied vent system must not be interchanged with other vent 

systems or unlisted pipe/fittings. Plastic components and 

specified primers and glues of the certified vent system must 

be from a single vent system manufacturer and not inter-

mixed with other vent system manufacturer’s vent system 

parts unless those are certified to be used with this system. 

Plastic vent systems shall also be installed such that the first 

three (3) feet (91 cm) of pipe from the water heater outlet are 

readily accessible for visual inspection. The air intake system 

does not have to meet the requirement of ULC S636, so regular 

schedule 40 PVC or CPVC pipes and fittings can be used to 

convey the flow of fresh air to the water heater.

IMPORTANT

This water heater is a power direct vent gas water heater that 

draws all of its combustion air from outside of the building and 

vents all of its combustion gases directly outside of the building.
This water can be vented using only one of the following options:

• Three (3) inch (7.6 cm) schedule 40 PVC or CPVC pipe and 

fittings; 

PolyPro

®

InnoFlue

®

• Three (3) inch (7.6 cm) polypropylene rigid pipe and fit-

tings from Centrotherm (Innoflue single wall vent system); 

PolyPro

®

InnoFlue

®

• Three (3) inch (7.6 cm) polypropylene rigid pipe and fit-

tings from DuraVent (Polypro single wall gas vent system).

PolyPro

®

InnoFlue

®

 

Before installing the vent piping, make sure that the vent sys-

tem layout has been properly planned. Make sure that the flue 

baffle has been installed in the flue tube. If the baffle is not 

present, immediately contact the dealer where the water heater 

was purchased. 

NEVER

 operate the water heater without the 

flue baffle installed. Verify that the location of the water heater 

respects all clearances from combustible material, all venting 

requirements 

(see Table 1)

, and that the vent terminations 

will be installed as specified by all local codes or, in the absence 

of local codes, the latest edition of CAN/CSA B149.1, Natural 

Gas and Propane Installation Code, in Canada, and/or the latest 

edition of the National Fuel Gas Code, ANSI Z223.1/NFPA 54, in 

the United States

 (see Figure 3)

.

This water heater must be vented directly to the outdoors, either 

horizontally through the wall or vertically through the roof. The 

venting must not be attached to an existing chimney, or in com-

mon with any other appliance, and must not be insulated. If 

possible, locate the water heater so that the venting length and 

number of elbows are kept to the minimum necessary to reach 

the outside.

Venting Connection to the water heater

PVC PIPE: 

PolyPro

®

InnoFlue

®

A vent system adaptor should be installed when using PVC 

pipes for venting this water heater 

(see Figure 2)

. The vent 

system adaptor supplied with the water heater is made of IPEX 

parts. If another manufacturer of pipe is used to build the vent 

system, the vent system adaptor must be made from parts of 

that same manufacturer. 

CPVC PIPE: 

PolyPro

®

InnoFlue

®

The CPVC pipe must be inserted directly into the rubber transi-

tion fitting on the outlet of the blower assembly. 

POLYPROPYLENE PIPE FROM CENTROTHERM 

(Innoflue single wall vent system): 

PolyPro

®

InnoFlue

®

Use special appliance adapter from Centrotherm and insert into 

the rubber transition fitting on the outlet of the blower assem-

bly. 

Refer to the Table 2 and Figure 4

 below for proper 

part number from Centrotherm.

Table 2 — Centrotherm™

Appliance adapter

Increaser

3-inch (7.6 cm) pipe

ISAA0202

ISIA0203

POLYPROPYLENE PIPE FROM DURAVENT 

(Polypro single wall gas vent system): 

PolyPro

®

InnoFlue

®

Use special appliance adapter from DuraVent and insert into the 

vent system adaptor on the outlet of the blower assembly. 

Refer 

to the Table 3 and Figure 5

 below for proper part number from 

DuraVent. Make sure to use the Appliance Adapter clamp to connect 

the PolyPro Appliance Adaptor to the Vent System Adaptor and to 

tighten both hose clamps on the Appliance Adapter Clamp to ensure 

the connection is secure.

INSTALLATION INSTRUCTIONS

Table 1

MAXIMUM EQUIVALENT LENGTH FOR VENT PIPE —  DO NOT EXCEED 

VENT PIPE DIAMETER FOR 3’’ PDV MODELS ONLY

3 inches (7.6 cm)

Maximum equivalent length*

80.0 feet (24.4 m)

Minimum equivalent length*

9.5 feet (2.9 m)

One 45-degree elbow is equivalent, in straight pipe, to

4.0 feet (1.2 m)

One 90-degree elbow is equivalent, in straight pipe, to 

7.0 feet (2.1 m)

Concentric Vent Termination max. length (optional)

80.0 feet (24.4 m)

Restrictor Screen

0 to 80 feet (24.4 m)

Restrictor Screen (for concentric vent termination)

0 to 80 feet (24.4 m)

*Note: Outdoor termination elbow not to be counted when determining total length.

Содержание InnoFlue Centrotherm

Страница 1: ...or any other appliance WHAT TO DO IF YOU SMELL GAS DO NOT try to light any appliance DO NOT touch any electrical switch DO NOT use any phone in your building From a neighbour s phone immediately call your gas supplier and EnerCare Home Services Follow their instructions If you cannot reach immediately the above suppliers call the fire department at 911 Installation and service must be performed on...

Страница 2: ...t nettoyant liquide Éviter les endroits humides et les températures sous le point de congélation Si le détecteur décèle la présence de vapeurs inflammables le contôle au gaz se vérouillera et le chauffe eau cessera de fonctionner Ne tentez pas de le remettre en marche Faite inspecter le chauffe eau immédiatement par un technicien de service qualifié ou le fournisseur de gaz ATTENTION Safety Inform...

Страница 3: ...ert symbol This symbol alerts you to potential hazards that can kill or hurt you and others All safety messages will follow the safety alert symbol and either the word DANGER or WARNING Serious injury or death can occur if you do not fol low the instructions immediately Serious injury or death can occur if you do not fol low the instructions WARNING AVERTISSEMENT DANGER WARNING AVERTISSEMENT DANGE...

Страница 4: ...or this water heater are Two 2 inches 5 1 cm from the sides and rear four 4 inches 10 2 cm from the front and eighteen 18 inches 45 7 cm from the top see Figure 1 18 min 2 min 2 min 2 min 4 min Figure 1 Venting DANGER WARNING CAUTION AVERTISSEMENT ATTENTION When installing the venting system make sure to follow all local codes or in the absence of local codes the latest edition of CAN CSA B149 1 N...

Страница 5: ...1 NFPA 54 in the United States see Figure 3 This water heater must be vented directly to the outdoors either horizontally through the wall or vertically through the roof The venting must not be attached to an existing chimney or in com mon with any other appliance and must not be insulated If possible locate the water heater so that the venting length and number of elbows are kept to the minimum n...

Страница 6: ...6 INSTALLATION INSTRUCTIONS 2 18 min 3 min 8 max 18 min 8 min IN ANY DIRECTION 8 min See Figure 6A 90 INTAKE TERMINAL 18 min 90 INTAKE TERMINAL 18 min VENT TERMINAL Figure 2 ...

Страница 7: ...d within ten 10 feet 3 05 m The Vent Termination must have a Canadian Installations U S Installations A Clearance above grade veranda porch deck or balcony 12 inches 30 cm 12 inches 30 cm B Clearance to window or door that may be opened 12 inches 30 cm 9 inches 23 cm or 12 inches 30 cm C Clearance to outside corner D Clearance to inside corner 3 feet 91 cm E Clearance to service regulator vent out...

Страница 8: ...nce around the piping for air circulation FOR PVC AND CPVC PIPING PolyPro InnoFlue Make sure that all horizontal runs have a minimum rise of 1 4 inch per foot 21 mm m of run see Figure 7 Horizontal runs of vent pipe must be supported every three 3 feet 91 cm FOR POLYPROPYLENE PIPE FROM CENTROTHERM Innoflue single wall vent system PolyPro InnoFlue Make sure that all horizontal runs have a minimum r...

Страница 9: ... horizontal runs have a minimum rise of 5 8 inch per foot 56 mm m of run Follow instruction of the vent pipe manufacturer for proper vent support Clamp or Strap field supplied 1 2 5 cm Min 2 5 cm Max Exhaust Optional Elbow see local codes voir codes locaux Coude optionnel Exhaust Distance above average snowfall or grade reference CSA B149 1 Air intake Air intake Exterior wall 1 2 5 cm Min 2 5 cm M...

Страница 10: ...acturer Vent Termination Through The Wall PVC CPVC VENT SYSTEM PolyPro InnoFlue Two 2 90 degree PVC elbows are supplied with the water heater and shall be installed at the end of the vent and air intake piping to serve as the termination for through the wall installation when the vent system is built with PVC pipes If CPVC is used to build the vent system use 90 degree CPVC elbows that are approve...

Страница 11: ... A plastic tube can be attached to this outlet to drain any condensate that has accumulated away from the water heater Make sure that the condensate removal tube flows to a suitable free flowing drain Water Piping Refer to Figure 7 for a typical installation Use of this lay out should provide a trouble free installation for the life of the water heater Before making the plumbing connections locate...

Страница 12: ...ruction can result in premature failure of the water heater that is not covered by the warranty Check that all of the water piping connections have been made To fill the water heater 1 Make sure that the water heater drain valve is closed by inserting a flat head screwdriver into the slot on the head of the drain valve and turning the knob clockwise 2 Open the cold water supply manual shut off val...

Страница 13: ...operly secured as there is a possibility that they have become loose during transport If any of the original wiring needs replacing use only 18AWG type or greater wire that is approved for 221o F 105o C Installation Instructions for Water Heaters Approved for Combination Space Heating and Potable Water Heating see Figure 10 A water heater cannot be used for space heating only When using a water he...

Страница 14: ...ower Unit M High Limit Switch Vacuum Switch N C Power Cord Hot Surface Igniter Flame Sensor Flammable Vapor Sensor Gas Control 5 3 4 1 6 2 5 3 4 1 6 2 Vacuum Switch N O Jaune Bleu Jaune Unité de Ventilati M Interrupteur Haute Limite Interrupteur de Pression Négative N F Interrup Nég Unité de Ventilation M Interrupteur Haute Limite Interrupteur de Pression Négative N F Interrupteu Négati Figure 9 H...

Страница 15: ... under water Immediately call an EnerCare qualified installer or service agency to replace a flooded water heater Do not attempt to repair the unit It must be replaced 1 Set the thermostat to the lowest setting by first pressing the COOLER and HOTTER buttons at the same time and holding for one 1 second Then press the COOLER button until only the VAC indicator light is lit 2 Toggle the ON OFF swit...

Страница 16: ...70 21 Vacances 110 43 115 46 120 49 125 52 130 54 135 57 140 60 145 63 150 66 160 71 TEMPS NÉCESSAIRE POUR CAUSER UNE BRÛLURE S O 5 minutes 30 secondes 5 secondes 1 5 seconde moins d une seconde AFFICHAGE Figure 11 To decrease the temperature press and release the COOLER button once The temperature indicators will now display the new temperature setting Press and release the COOLER button until yo...

Страница 17: ...d the FV sensor is designed to automatically reset itself The Intelli Vent gas control however will have gone into lock out mode and will need to be manually reset An EnerCare qualified service technician must be called to determine if flammable vapours entered the combustion chamber and ignited In most instances there will not have been ignition of flammable vapours inside the combustion chamber ...

Страница 18: ...are issue but a consumer issue in the water supply and the consumer is responsible for any appa ratus needed to remove the rotten egg smell DANGER WARNING CAUTION AVERTISSEMENT ATTENTION Hydrogen gas can be produced in a hot water sys tem that has not been used for a long period of time generally two 2 weeks or more HYDROGEN GAS IS EXTREMELY FLAMMABLE It is highly recommended to open the hot water...

Страница 19: ... 2 Flammable Vapour Sensor 3 Protective Cover 4 Hot Surface Igniter 5 Burner Assembly 6 Inner Door 7 Jacket Door 8 Drain Valve 9 Overflow Tube 10 Dip tube 11 Temperature Pressure Relief Valve 12 Magnesium Anode 13 Flue Baffle 14 Inlet Rubber Adapter 15 Vacuum switch Inlet 16 Vacuum switch Outlet 17 High Limit Switch 18 Outlet Rubber Adapter 19 Blower Assembly 20 Outlet Nipple ...

Страница 20: ... the water heater Check and repair 7 The gas valve driver circuit 1 Turn off the power to the water heater for 10 seconds and then back on 2 If the above step did not clear the error replace the gas control valve 8 The internal microcomputer 1 Turn off the power to the water heater for 10 seconds and then back on 2 If the above step did not clear the error replace the gas control valve 9 The inter...

Страница 21: ...ol valve Replace with new gas control valve High operating costs Gas control valve set too high Turn temperature dial to desired temperature Sediment or lime in tank Drain Check to see if water treatment is necessary Water heater is undersized Install size of water heater that meets demand Wrong piping connections Correct piping dip tube must be in cold inlet Leaking faucets Repair faucets Gas lea...

Страница 22: ...roblem should go away If it persists check all plumbing connections for leaks Heavy draws of hot water with very cold refill water Let water heater warm up Problem should go away If it persists check all plumbing connections for leaks Water heater is undersized Install size of water heater that meets demand Combustion odours Insufficient secondary air Check that the air intake terminal is not bloc...

Страница 23: ..._________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________...

Страница 24: ...www directenergy com ...

Отзывы: