TSA 160 NT and variants
34
Electrical installation and device settings
7.2.5 Speed adjustment
For 2-leaf systems the integrated closing sequence control ensures that the active leaf begins its closing process
approx. 1.5 s after the passive leaf. The speeds have to be set so that the passive leaf is closed first.
X
Optimise the closing process with "SG" and "SD".
à
Closing speed
SG adjusting screw
à
Latching speed
SD adjusting screw
à
Latching
SE adjusting screws (not with Invers drives)
X
Optimise the opening process with "ÖG" and "ÖD".
à
Opening speed
ÖG adjusting screw
à
Back check
ÖD adjusting screw
TSA 160NT EN3-6
TSA 160NT Invers EN3-6
CAUTION!
On opening from the closed position the latching (SE) affects the opening speed (ÖG).
X
Only partially open the latching (SE) valve.
If the latching action valve (SE) is opened too wide, this will lead to a reduction in opening force.