background image

Powerdrive product family

2

 

Contents

1 Introduction...............................................................................................................................................................3

1.1 

Symbols and illustrations ..............................................................................................................................................................................3

1.2 

Revisions and validity......................................................................................................................................................................................3

1.3 

Product liability .................................................................................................................................................................................................3

1.4 

Reference documents .....................................................................................................................................................................................3

Fundamental safety notes ....................................................................................................................................4

2.1 

Intended use.......................................................................................................................................................................................................4

2.2 

Safety notes ........................................................................................................................................................................................................4

2.3 

Safety-conscious working .............................................................................................................................................................................5

2.4 

Environmentally conscious working .........................................................................................................................................................5

2.5 

Safety note related to transportation and storage ..............................................................................................................................5

2.6 Qualification .......................................................................................................................................................................................................5

About this document .............................................................................................................................................6

4 Overview.....................................................................................................................................................................6

4.1 Diagrams ..............................................................................................................................................................................................................6
4.2 

Tools and aids .....................................................................................................................................................................................................6

4.3 Torques .................................................................................................................................................................................................................6
4.4 

Components and assembly groups ...........................................................................................................................................................7

4.5 

VP-Kit bill of material .......................................................................................................................................................................................7

5 Pre-mounting ............................................................................................................................................................8

5.1 

Machining the track and cover ....................................................................................................................................................................8

5.2 

Preparing the track ..........................................................................................................................................................................................8

5.3 

Installing stop buffers .....................................................................................................................................................................................9

5.4 

Connecting the contact on the toothed belt locking (optional) ....................................................................................................9

5.5 

Installing the drive components .............................................................................................................................................................. 10

5.6 

Installing cable guides ..................................................................................................................................................................................11

5.7 

Connecting transformer and control unit .............................................................................................................................................11

5.8 

Connecting motor gear unit and control unit .....................................................................................................................................13

5.9 

Connecting the tooth belt locking mechanism (optional) and control unit ............................................................................14

5.10 

Fitting the transformer ground .................................................................................................................................................................15

5.11 

Fitting the cover earthing............................................................................................................................................................................15

5.12 

Installing the side plates ............................................................................................................................................................................. 16

5.13 

Connecting the rechargeable battery and control unit ..................................................................................................................17

Device safety test and production test ..........................................................................................................18

6.1 

Unplugging the cables .................................................................................................................................................................................18

Содержание Powerdrive PL

Страница 1: ...Powerdrive Product family EN Pre installation instructions 192474 01...

Страница 2: ...ps 7 4 5 VP Kit bill of material 7 5 Pre mounting 8 5 1 Machining the track and cover 8 5 2 Preparing the track 8 5 3 Installing stop buffers 9 5 4 Connecting the contact on the toothed belt locking o...

Страница 3: ...itional Information X X Symbol for an action This means you have to do something X X If there are several actions to be taken keep to the given order 1 2 Revisions and validity Version 01 valid for Po...

Страница 4: ...and repair work must be performed by properly trained personnel authorised by GEZE The country specific laws and regulations are to be observed during safety technology tests If unauthorised changes...

Страница 5: ...unsecured crushing impact drawing in or shearing spots Risk of injury due to sharp edges on the drive and door leaf Risk of injury during installation through freely moving parts 2 4 Environmentally...

Страница 6: ...er bespoke 150 105 90 70499 2 0247 Component drawing Track perforated 70485 2 0200 Component drawing Track bespoke PL 2 leaf 70485 2 0251 Component drawing Track bespoke PL 1 leaf The diagrams are sub...

Страница 7: ...lide to open 1 leaf left hand slide to open 4 5 VP Kit bill of material 1 Cover fixing 2 Transformer ground 3 Transformer 4 Transformer cable 5 Deflection pulley 6 Cable guide 7 Track 8 Control unit 9...

Страница 8: ...k profiles for damage X X Cut the track and cover to the required length see machining drawings Chapter 4 1 X X Check whether additional bore holes are necessary see machining drawing for bespoke trac...

Страница 9: ...f installation 5 4 Connecting the contact on the toothed belt locking optional X X Remove the screws 2 on the feedback switch 1 of the tooth belt locking mechanism X X Place the alarm contact switch 3...

Страница 10: ...ction pulley measured from the middle U2 Position of the motor gear unit UR Position of the deflection pulley measured from the side Vrs Extension left Vls Extension right When the drive is extended V...

Страница 11: ...ormer and control unit X X Make sure that cables are cut to length and routed in such a way that they do not become jammed when the cover is positioned and cannot come into contact with moving compone...

Страница 12: ...ide DCU 4 to the control unit X X Guide the transformer cable 1 between the control unit 2 and track 5 Alternatively the transformer cable 1 can also be mounted on the front of the control unit X X Fi...

Страница 13: ...into the control unit 4 2 3 4 Powerdrive PL FR X X Route the rotary encoder cable 2 motor connection cable 3 and motor connection cable of the second motor gear unit 1 to control unit X X Insert the...

Страница 14: ...tooth belt locking mechanism 1 in at the control unit 2 1 2 X X Lay the cable for tooth belt locking mechanism 1 through the cable guide to the tooth belt locking mechanism optional 3 shorten if nece...

Страница 15: ...trate the anodised layer of the track 5 11 Fitting the cover earthing X X Screw the cable shoe of the cover earthing cable 6 using a countersunk screw 3 serrated washer 4 and hexagon nut 5 to the cove...

Страница 16: ...8 x 13 countersunk tapping screws 3 X X Screw the threaded pins 5 completely into the retaining blocks 4 from below 2 5 4 X X Glue the side cover panels 7 to the side plates 2 on the outside with 4 g...

Страница 17: ...1 is plugged in the pulley on the motor gear unit may move suddenly X X Do not reach into the area of moving parts X X Check whether the rechargeable battery cable 1 is long enough X X If necessary pl...

Страница 18: ...etween the PE line of the mains cable and the metal part contacted with the probe is tested in each case Use the probe to contact at least the following test points Transformer metal bracket PE connec...

Страница 19: ...Powerdrive product family 19 Device safety test and production test...

Страница 20: ...geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office india...

Отзывы: