25
Commissioning
– continued –
Changing factory set node ID of URB 1, adjusting / changing node ID of URB 1
– continued –
Possibilities to display bus devices
The URB 1 can display only
one
level monitoring device,
one
low-level alarm,
one
high-level alarm
and only
one
conductivity monitoring device per vessel (e.g. steam boiler or feedwater deaerator).
If the monitoring systems of more than one vessel are to be displayed, provide
one URB 1 per vessel.
Press button
briefly.
The system will re-start.
The start window appears after approx.
10 seconds.
In our example the node ID was set to “061”.
briefly
Содержание URB 1
Страница 1: ...1 E N English Operating Terminal Display Unit URB 1 Original Installation Instructions 810375 07 ...
Страница 9: ...9 045 3450 S cm S cm W W 8 Technical Data continued Dimensions Fig 2 6 3 95 95 ...
Страница 10: ...10 Design URB 1 Fig 3 9 8 7 8 ...
Страница 11: ...11 Functional Elements URB 1 Fig 4 1 6 5 4 3 2 ...
Страница 82: ...82 For your Notes ...
Страница 83: ...83 For your Notes ...