![Georges Renault CVIS II Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/georges-renault/cvis-ii/cvis-ii_operators-manual_2215373064.webp)
6159932410-02
English
64 / 76
CYCLE FLOWCHART AND TIMING CHART
2 - CYCLE TIMING CHART
• phase 1
: resetting is initiated by the PLC --> resets the report. (This PLC control is not compulsory).
• phase 2
: the controller receives cycle no. 1 --> cycle acknowledge no.1 is validated (if the cycle is pro-
grammed).
• phase 3
: the controller receives the "cycle start" --> validates the "in cycle" signal.
• phase 4
: at the end of the cycle, the controller validates an "accept" or "reject" report which is sent to the PLC.
• phase 5
: the "in cycle" signal returns to zero when all the operations of the system are over.
To optimise cycle time, the PLC or digital control can be synchronised with the "accept report" or "reject report" signal
but the tightening system is not ready to receive new commands (resetting, etc.) until the "in cycle" signal has dropped.
r e a d y
c y c l e 1
c y c l e 2
c y c l e . . .
c y c l e a c k n o w . 1
c y c l e a c k n o w . 2
c y c l e a c k n o w . . . .
s p i n d l e v a l i d a t i o n
c y c l e s t a r t
i n c y c l e
a c c e p t o r r e j e c t
r e p o r t
r e s e t
ph
as
e
2
ph
as
e
3
ph
as
e
4
ph
as
e
5
ph
as
e
1
Содержание CVIS II
Страница 8: ...6159932410 02 English 8 76 SAFETY INSTRUCTIONS...
Страница 12: ...6159932410 02 English 12 76 DESCRIPTION AND OPERATION...
Страница 18: ...6159932410 02 English 18 76 INITIAL START UP...
Страница 28: ...6159932410 02 English 28 76 RESULTS...
Страница 48: ...6159932410 02 English 48 76 CONNECTIONS AND INSTALLATION...
Страница 66: ...6159932410 02 English 66 76 CYCLE FLOWCHART AND TIMING CHART...
Страница 74: ...6159932410 02 English 74 76 PARTS LIST...