![Georges Renault CVIS II Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/georges-renault/cvis-ii/cvis-ii_operators-manual_2215373032.webp)
6159932410-02
English
32 / 76
MAINTENANCE
2.5 - Autotest cycle
Autotest cycle flowchart
The autotest cycle allows you to check that:
• the prevailing torque is lower than the programmed maximum
torque setting.
• the rotation angle ranges between the programmed minimum and
maximum angle settings.
As for any other cycle, the automatic zero correction and the
unbalance test are performed at the beginning of the cycle.
The autotest cycle usually includes a single tightening phase.
At the end of the cycle, according to the 3 tests in the following
flowchart, the "accept report" or "reject report" information gives the
result.
The following parameters are for information only:
Max time
1 s
Tightening type
torque and angle
Tmin
0 Nm
Ttarget
5 Nm
Tmax
4,5 Nm
Amin
300 °
Amax
3000 °
Asafe
3000 °
Angle threshold
0 Nm
Baud rate
100 %
Power
20 %
S t a r t
y e s
n o
A u t o m a t i c z e r o
c o r r e c t i o n A Z C
E n d
T r a n s d u c e r z e r o t e s t
c o r r e c t i o n
£ 4
0 0 m V
U n b a l a n c e t e s t
y e s
n o
- 0 . 5 %
£
d r i f t
£
0 . 5 %
R o t a t i o n t e s t d u r i n g
t h e p r o g r a m m e d t i m e
C o n t r o l o f p r e v a i l i n g t o r q u e
a n d a n g l e
y e s
n o
O K ?
A c c e p t r e p o r t
E n d
R e j e c t r e p o r t
F a i l u r e d i s p l a y
Содержание CVIS II
Страница 8: ...6159932410 02 English 8 76 SAFETY INSTRUCTIONS...
Страница 12: ...6159932410 02 English 12 76 DESCRIPTION AND OPERATION...
Страница 18: ...6159932410 02 English 18 76 INITIAL START UP...
Страница 28: ...6159932410 02 English 28 76 RESULTS...
Страница 48: ...6159932410 02 English 48 76 CONNECTIONS AND INSTALLATION...
Страница 66: ...6159932410 02 English 66 76 CYCLE FLOWCHART AND TIMING CHART...
Страница 74: ...6159932410 02 English 74 76 PARTS LIST...