3. Connect the DB9 port of EEPROM BOARD to the RECEIVING
MASTER. Turn on the power to the RECEIVING MASTER. Menu 10
will be displayed, and be ready for setting.
4. Disconnect the power supply of the RECEIVING MASTER when
parameter entry is finished and checked as correct. Pull out the
EEPROM and insert it back in its socket on the DIALING UNIT.
7
Содержание Triathlon III T3UPS-13-15K
Страница 18: ...1 7 Dimension Drawings 10KVA 60KVA OUTLINE DRAWING 1 13...
Страница 19: ...10KVA 60KVA INTERIOR DRAWING 1 14...
Страница 20: ...75KVA 160KVA OUTLINE DRAWING 1 15...
Страница 21: ...75KVA 160KVA INTERIOR DRAWING 1 16...
Страница 22: ...175KVA 320KVA OUTLINE DRAWING 1 17...
Страница 23: ...175KVA 320KVA INTERIOR DRAWING 1 18...
Страница 24: ...INTER PCB DIAGRAM 1 19...
Страница 31: ...1...
Страница 35: ...3 3...
Страница 70: ...ONE TO TWO SERIAL REDUNDANCY 8 3...
Страница 77: ...Appendices Additional Data on Options UPSCOMTM UPSCALLTM DCMANTM...
Страница 80: ...3...
Страница 81: ......