![Georator Triathlon III T3UPS-13-15K Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/georator/triathlon-iii-t3ups-13-15k/triathlon-iii-t3ups-13-15k_instruction-manual_2214847042.webp)
3.4. Terminal Connection
Although different sizes of UPS may have slightly different cable connection terminal
blocks, all UPS connection terminal alignments falls into one of the following types:
RR
RS
RT
IN
IR
IT
OR OS
OT
B+
B-
INPUT
UPS
IN
IR
UPS
OR
IT
IS
OS
OT
INPUT
B-
ON
3 PHASE INPUT /
3 PHASE INPUT /
TERMINAL WITH SINGLE SOURCE
IS
ON
RESERVE
RECTIFIER
INPUT
OUTPUT
INPUT
BATTERY
INPUT
RECTIFIER & RESERVE
OUTPUT
BATTERY
B+
3 PHASE OUTPUT
TERMINAL WITH TWO SOURCE
3 PHASE OUTPUT
☆☆☆
Three extra terminals are installed for convenience of changing the unit to
separate reserve input.
3-10
Содержание Triathlon III T3UPS-13-15K
Страница 18: ...1 7 Dimension Drawings 10KVA 60KVA OUTLINE DRAWING 1 13...
Страница 19: ...10KVA 60KVA INTERIOR DRAWING 1 14...
Страница 20: ...75KVA 160KVA OUTLINE DRAWING 1 15...
Страница 21: ...75KVA 160KVA INTERIOR DRAWING 1 16...
Страница 22: ...175KVA 320KVA OUTLINE DRAWING 1 17...
Страница 23: ...175KVA 320KVA INTERIOR DRAWING 1 18...
Страница 24: ...INTER PCB DIAGRAM 1 19...
Страница 31: ...1...
Страница 35: ...3 3...
Страница 70: ...ONE TO TWO SERIAL REDUNDANCY 8 3...
Страница 77: ...Appendices Additional Data on Options UPSCOMTM UPSCALLTM DCMANTM...
Страница 80: ...3...
Страница 81: ......