
34
Fig. 56 First connection to the cylinder
Fig. 55 Second hydraulic motor connection
Fig. 57 First connection on the cylinder
top)
(
Fig. 58 Second connection to the cylinder
Fig. 59 Second connection on the cylinder
Now check
all
hydraulic connections are
seated correctly and tight.
This applies to
all hose connections, flow regulator, check
valve and connections on the actual
machine. Once adjusted the flow control
valve must be secured with the lock screw.
Fig. 60 Flow control valve fixed by locknut
Fig. 61 Adjusting the flow control valve
5
5
6
6
Содержание BJ 120
Страница 1: ...OPERATION AND MAINTENANCE MANUAL...
Страница 6: ...6...
Страница 13: ......
Страница 25: ...25 Fig 38 Screws and nuts Fig 42 Correct installed position...
Страница 26: ......
Страница 38: ...PARTS DRAWINGS AND LISTS...