1.
Remove transport packaging
Remove the transport packaging When
opening the steel crate, beware of sharp
edges on the locking mechanisms.
2.
Scope of delivery
Remove all of the wood packaging and protective
film. Remove all loose parts and put them aside
for later use. Verify the delivery is complete, see
Figures 4 to 7. Always be careful not to crush or
damage the hydraulic lines.
Important note:
The transport box may contain more bolts,
nuts, washers, etc. than required for initial
installation. This is intentional and not a
defect in quality.
Fig. 5 Scope of delivery
3.
Attaching European attachment to the
machine
Fig. 4 Open crate
Fig. 6 Sickle bar and European attachment
Fig. 7 Fastening materials