background image

Once the Left and Right rail sections have been attached, the next step is to attach the

LEFT AND RIGHT stop end tubes. These 1” x 3” black aluminum tubes attach to the very end
of each side rail section. The hardware needed should already be screwed into the tapped holes
for attachment.

LEFT SIDE RAIL SECTION SHOWING THE END TUBE AND CROSS CHANNELS

With both the Left and Right rail sections attached and level, position the loading table

that was shipped separately from the press. This is done by rolling the loading table into the rail
section from the proper end. This is determined by the loading table that was already on the press
when shipped.

 

Remove the end stop tube from the side that the loading table must be rolled in from.

 

Lift the loading table using a fork lift to the height needed to feed and roll the loading table
onto the rail assembly.

 

Carefully roll the loading table onto the aluminum rails. Lift the opposite side it is entering
from to prevent the handle brackets from making contact with the rail.

 

Once the entire loading table is in place, re-attach the end stop tubes.

 

Proceed with attaching the handle to the front of the loading table using hardware supplied.

With both loading tables on the rail sections and the end stop tubes in place, roll each

table carefully back and forth to test the motion. If it is difficult to manually move the loading
table, adjust the lower neoprene roller bracket on the loading tables to reduce the amount of
friction against the rails.

In order for the MAXI PRESS to activate, there is a safety lever switch that must be

depressed with the loading table under the heater block. In the event that the machine does not
activate properly, inspect this lever switch and hardware to adjust for proper operation.

LEFT SIDE
STOP END
TUBE

LOWER LEG
CROSS CHANNELS

Содержание Maxi Press Air

Страница 1: ...MAXI PRESS AIR OWNERS MANUAL REV 10 2010...

Страница 2: ...air maxi from its crate It is recommended that a forklift be used to remove the AIR MAXI PRESS from the crate CARE MUST BE USED TO POSITION THE FORKS IN AN AREA THAT WILL NOT DAMAGE ANY OF THE LOWER A...

Страница 3: ...DIGITAL CONTROLLER MANUAL for proper operation of the digital controller SETTING THE AIR PRESSURE Set the pressure by pulling up on the regulator knob and turning to the desired pressure For most app...

Страница 4: ...r of the loading table mounted on the machine frame must be pressed in the closed position by the loading table see pic The most common reason for why the machine will not activate when the two black...

Страница 5: ...VALVE 40 X 64 PRESSES 1 ARN 4ZJ86 ADJUSTABLE EXH FLOW CONTROL 30 X 40 PRESSES 2 ARN 4ZJ86 ADJUSTABLE EXH FLOW CONTROL 40 X 64 PRESSES MECHANICAL COMPONENTS SINGLE STATION TOP HEAT ONLY PRESSES 2 MEN...

Страница 6: ...ED RIGHT SIDE SHUTTLE SECTION UNPACKING Your machine was shipped in two main crates One crate has the main MAXI PRESS AIR with one of the loading tables mounted under the heater block The 2nd crate co...

Страница 7: ...wer cross channels on each section and tighten Make sure that the adjustable leg locking nut is tightened to prevent movement of the foot Before tightening all hardware make sure of the following All...

Страница 8: ...and roll the loading table onto the rail assembly Carefully roll the loading table onto the aluminum rails Lift the opposite side it is entering from to prevent the handle brackets from making contact...

Страница 9: ...de of Front Rear Left Right tubes The Front and Rear tubes attach to the maxi press by 6 threaded studs attached to holes in the tubes welded to the lower stand of the Maxi Press Air The Front and Rea...

Страница 10: ...ngles into the front and rear Roller Frame then attach the left and right end tubes NOTE The left and right end tubes that are attached to the front and rear angles are attached to the TOP SIDE of the...

Страница 11: ...inum tray The out riggers are attached to the left side of the lower roller frame assembly Three screws are used to screw up from under the left side tube too the 3 tapped standoffs welded to the end...

Страница 12: ...s so the Teflon blanket is centered within the Teflon Shuttle Frame 3 Slide in the long and short brass rods into the stitched seams of the Teflon blanket 4 From the center out hook the Teflon springs...

Страница 13: ...e left or right side tubes of the shuttle assembly when the machine is activated The machine is designed to allow activation of the machine anywhere with in the Teflon blanket for long multiple pressi...

Отзывы: