background image

ACTIVATE THE PRESS: 

Regardless of the size or options of the MAXI PRESS AIR, all of

the MAXI PRESS AIRES require the following to take place in order for the machine to
activate.

 

Press BOTH the left & right activate buttons on the sides of the control console

 

The loading table index lever switch (a micro switch at the rear of the loading table mounted
on the machine frame) must be pressed in the closed position by the loading table. (see pic)

The most common reason for why the machine will not activate when the two black activate

buttons are pressed is either the Emergency Release button has been pressed or the lower table
index switch is not activated or closed.

 

Loading table
index lever switch
found on all single
station front
loading machines

Loading table
index lever switch
found on rigid
table twin left-to-
right shuttle
machines

Содержание Maxi Press Air

Страница 1: ...MAXI PRESS AIR OWNERS MANUAL REV 10 2010...

Страница 2: ...air maxi from its crate It is recommended that a forklift be used to remove the AIR MAXI PRESS from the crate CARE MUST BE USED TO POSITION THE FORKS IN AN AREA THAT WILL NOT DAMAGE ANY OF THE LOWER A...

Страница 3: ...DIGITAL CONTROLLER MANUAL for proper operation of the digital controller SETTING THE AIR PRESSURE Set the pressure by pulling up on the regulator knob and turning to the desired pressure For most app...

Страница 4: ...r of the loading table mounted on the machine frame must be pressed in the closed position by the loading table see pic The most common reason for why the machine will not activate when the two black...

Страница 5: ...VALVE 40 X 64 PRESSES 1 ARN 4ZJ86 ADJUSTABLE EXH FLOW CONTROL 30 X 40 PRESSES 2 ARN 4ZJ86 ADJUSTABLE EXH FLOW CONTROL 40 X 64 PRESSES MECHANICAL COMPONENTS SINGLE STATION TOP HEAT ONLY PRESSES 2 MEN...

Страница 6: ...ED RIGHT SIDE SHUTTLE SECTION UNPACKING Your machine was shipped in two main crates One crate has the main MAXI PRESS AIR with one of the loading tables mounted under the heater block The 2nd crate co...

Страница 7: ...wer cross channels on each section and tighten Make sure that the adjustable leg locking nut is tightened to prevent movement of the foot Before tightening all hardware make sure of the following All...

Страница 8: ...and roll the loading table onto the rail assembly Carefully roll the loading table onto the aluminum rails Lift the opposite side it is entering from to prevent the handle brackets from making contact...

Страница 9: ...de of Front Rear Left Right tubes The Front and Rear tubes attach to the maxi press by 6 threaded studs attached to holes in the tubes welded to the lower stand of the Maxi Press Air The Front and Rea...

Страница 10: ...ngles into the front and rear Roller Frame then attach the left and right end tubes NOTE The left and right end tubes that are attached to the front and rear angles are attached to the TOP SIDE of the...

Страница 11: ...inum tray The out riggers are attached to the left side of the lower roller frame assembly Three screws are used to screw up from under the left side tube too the 3 tapped standoffs welded to the end...

Страница 12: ...s so the Teflon blanket is centered within the Teflon Shuttle Frame 3 Slide in the long and short brass rods into the stitched seams of the Teflon blanket 4 From the center out hook the Teflon springs...

Страница 13: ...e left or right side tubes of the shuttle assembly when the machine is activated The machine is designed to allow activation of the machine anywhere with in the Teflon blanket for long multiple pressi...

Отзывы: