3 m
1 m
3 m
6
Duct insulation, alt. A
Duct insulation, alt. B
Faulty duct insulation
Duct system
It is recommended that the duct system is executed in
spiral ducting connected with rubber ring seal fittings in
order to provide a leak-free and durable duct system.
To achieve a satisfactory low sound level from the unit,
attenuators must always be fitted to the supply and
extract duct system between the unit and the first supply
and extract fittings.
It is recommended that air speeds in the ducts are
dimensioned at sufficiently low level to prevent noise from
the ductwork.
When positioning fresh air and extract roof cowls/grills,
make sure the two air flows do not short circuit, causing
escaping air to be drawn in again.
It is recommended that the fresh air intake is placed on the
north or east side of the house to provide optimum comfort
with minimum influence by heating of the sun.
Recommended minimum horizontal distance between air
intake and exhaust: 3 meters.
Recommended minimum vertical distance between air
intake and exhaust: 1 meter.
Insulation of ducts in cold loft spaces
In order to exploit the unit’s high recovery potential
(efficiency), it is necessary to insulate the ducts correctly.
Genvex recommends as follows:
Supply and extract ducts
To minimise heat losses from the duct system in cold loft
spaces, the supply and extract ducts must be insulated
with a minimum of 100 mm insulation. If insulation form
alternative A is used, it is recommended that it is executed
with two layers of 50 mm lamella mats with paper or foil
externally and with staggered joints between the two
layers. If the ducts are laid on the rafter foot, alternative B
may be used. The insulation must always be tightly packed
round the ducts.
Fresh air and escaping ducts in cold spaces
It is recommended that fresh air and escaping ducts are
insulated with a minimum of 50 mm insulation. The fresh
air duct is insulated to prevent warm air in the loft in
summer from heating up the fresh air. Take care to seal the
termination where the escaping duct is led through the roof
or through the gable end, in order to avoid condensation
damage.
Refer to your local distributor for guidance on national
insulation directives.
Содержание ECO 375 TL
Страница 1: ...INSTALLATION MANUAL ECO 375 TS TL Mechanical ventilation with passive heat recovery A...
Страница 18: ...18 DECLARATION OF CONFORMITY Declaration of conformity can be downloaded at www genvex com...
Страница 19: ...19 DISASSEMBLY INSTRUCTIONS Remove filters Remove counterflow heat exchanger Remove fan Remove bypass actuator...