IMPORTANT:
When installing the ECO 375 follow these instructions:
1) Turn off the electricity before opening the unit
2) Install an air tight water trap on a non-freezing location
to compensate for the fan pressure.
3) The height of the water trap must be at least 50 mm.
4) Make sure that the drain flows downwards all the way
from the unit.
5) Pour 1 liter water into the drip tray of the unit to verify
that it is drained properly. Before each heating season
make sure that the drain is filled with water.
6) If freezing of the water trap occurs, it is necessary to
install a thermostat and electrical heater to prevent
freezing when the temperature drops below +2 °C.
7) Air flow adjustments must be made on both supply
and exhaust air sides before use of the machine. It is
important supply and exhaust air volumes are balanced.
8) It is recommended to keep the ducts closed until the unit
is started and the system is adjusted.
These instructions must be followed. If the condensate
drain is not made according to this instruction, Genvex can
not be made responsible for any additional damages, which
have nothing to do with the Genvex unit.
Dimensions drawing (in mm)
To allow access for service and maintenance, there must be
a clear space of a minimum of 600 mm in front of the unit
and 300 mm. below the unit (for access to condensate drain
and siphon)
ECO 375 TS/TL is supplied in a vertical version (as shown
below).
Weight: 40 kg
KVM-Genvex A/S recommends that you always carefully
plan the installation location of your Genvex product in re-
lation to the location of certain rooms. This is a technical
product featuring fans and/or a heating pump which – in
certain rare cases, in combination with inexpedient instal-
lation conditions – may result in dissatisfactory noise or
vibration disturbances. As a main rule, we recommend
that technical installations never be mounted right next
to a bedroom. At the same time, we recommend that when
your Genvex installation is fastened to the structure
of the building, this is done to a heavy structure, e.g.
concrete. Like-wise, you should also ensure that there is
no transmission of noise or vibrations through materials
that are in contact with the installation. If there is a risk of
transmission of noise and vibrations, we recommend that
you install additional vibration-damping materials and
soundproof the installation room.
1. Fresh air
2. Extract air (from building)
3. Exhaust air (to outside)
4. Supply air
5. Heat exchanger
6. Supply air fan
7. Extract air fan
8. Filter fresh air
9. Filter exhaust air
10. Electrical connection
11. Condensation tray
12. Condensation drain
595
307,4
307,4
172,2
278
143,5
161x 4
A
1
2
3
4
600
944
DETAIL A
SCALE 1 : 5
13
Electronic
Connection
179
5
6
7
8-9
10
11-12
Lokation:
3
INSTALLATION
Содержание ECO 375 TL
Страница 1: ...INSTALLATION MANUAL ECO 375 TS TL Mechanical ventilation with passive heat recovery A...
Страница 18: ...18 DECLARATION OF CONFORMITY Declaration of conformity can be downloaded at www genvex com...
Страница 19: ...19 DISASSEMBLY INSTRUCTIONS Remove filters Remove counterflow heat exchanger Remove fan Remove bypass actuator...