Denso unit -7
starter system:
Check the process:
a.
fuse
→
b. Battery
→
c. start switch
→
d. start motor
→
e start relay
→
f.one-way clutch
Check the process:
Project Handle
1. Battery (check the voltage)
12V
- Please replace or recharge
2.Fuse:(check 15A) KEY the ON
∞
-Replace
3.Main switch (KEY ON) Check the line color: Red / White (12V)
→
orange (12V)
Red / white, orange = 0V to replace the ingition switch Or
line barrier.
132
Содержание HOOLIGAN 170i
Страница 80: ...Fuel injection systems 4 name connect cable Quick diagnostic table 80...
Страница 115: ...Engine Reverse differential gear 5 1 Check the looseness of crankshaft bearing If it is loosen replace to a new one 115...
Страница 131: ...Denso unit 7 Locate the position of the main wiring 131...