Shock absorber / brake system/wheel - 6
6.1 Front wheel demolition
6.1.1
Front wheel measure
Steps:
1. Remove the "5" front brake bolts * 2.
2. Remove the front axle nut "6".
3.Remove the "5" front axle "4" spacer ring"3" code table gear and "2" wheels.
Torque: Parts5- 5.0~6.0kg-m
Measuring -
›
Horizontal direction:
≧
2.0mm
Vertical direction:
≧
2.0mm
Beyond the limits - replace
119
Содержание HOOLIGAN 170i
Страница 80: ...Fuel injection systems 4 name connect cable Quick diagnostic table 80...
Страница 115: ...Engine Reverse differential gear 5 1 Check the looseness of crankshaft bearing If it is loosen replace to a new one 115...
Страница 131: ...Denso unit 7 Locate the position of the main wiring 131...