17
Chapter 2: Helmet Preparation and Operation
7. Referring to
, carefully
align the receiver within the traced
outline and mark the two screw
holes for drilling. Repeat for the
other side.
8. Referring to
,
detach the earcups from the pile
fasteners, and peel back the pile
fasteners.
NOTES:
•
If necessary, peel the edgeroll away
in the earcup area to protect it from
the drill bit.
•
It is advisable to drill pilot holes,
using a #52 (1/16") drill bit, before
drilling full-size holes.
9. Ensuring that the pile fastener
inside the helmet is not in the
drilling area, drill both the right
and the left marked hole locations
.)
10.
Carefully remove any frayed fibers
resulting from drilling.
(Continued on next page)
When drilling (Step 9), keep your
hands away from the drill bit to
avoid injury.
When drilling (Step 9), hold the
drill perpendicular to the helmet to
prevent damage.
CAUTION
Outline
Figure 2-17. Marking Hole Locations
Figure 2-18. Earcup and Pile Fastener
Figure 2-19. Drilling Holes
Pile fastener
peeled back
(both sides)
Earcup
detached
(both sides)