![Genie TMZ-34/19 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/genie/tmz-34-19/tmz-34-19_service-manual_2211929026.webp)
REV C
June 2005
Section 3 • Scheduled Maintenance Procedures
3 - 10
TMZ-34/19
Part No. 52075
CHECKLIST
A
PROCEDURES
A-9
Perform Axle Maintenance -
CE Models
Axle specifications require that this
procedure be performed 500 km
after regreasing the wheel
bearings.
Proper axle maintenance, following the axle
manufacturer's maintenance schedule, is essential
to good axle performance and service life. Failure
to perform the maintenance procedures can lead to
poor axle performance and component damage.
Required maintenance procedures and additional
axle information is available in the Knott Axle
Service Manual (Knott part number P005).
Knott Axle Service Manual
Genie part number
84443
A-10
Perform 30 Day Service
The 30 day maintenance procedure is a one-time
procedure to be performed after the first 30 days or
40 hours of usage. After this interval, refer to the
maintenance tables for continued scheduled
maintenance.
1 Perform the following maintenance procedures:
· A-11
Grease the Turntable Rotation
Bearing and Rotate Gear
· B-8
Inspect the Parking Brake
· D-1
Check the Turnable Rotation
Bearing Bolts
· D-3
Replace the Hydraulic Tank
Return Filter
800-610-4101
ActionRental.com