REV C
June 2005
Section 3 • Scheduled Maintenance Procedures
Part No. 52075
TMZ-34/19
3 - 7
A-4
Perform Axle Maintenance -
ANSI Models
Axle specifications require that this
procedure be performed, initially
and following a wheel change,
after the first 10, 25 and 50 miles.
Proper axle maintenance, following the axle
manufacturer's maintenance schedule, is essential
to good axle performance and service life. Failure
to perform the maintenance procedures can lead to
poor axle performance and component damage.
Required maintenance procedures and additional
axle information is available in the Dexter Axle
Operation Maintenance Service Manual
(Dexter part number LIT-001-00).
Dexter Axle Operation Maintenance Service Manual
Genie part number
84376
CHECKLIST
A
PROCEDURES
A-3
Perform Hitch Maintenance -
ANSI Models
Hitch specifications require that
this procedure be performed daily.
Proper hitch maintenance, following the hitch
manufacturer's maintenance schedule, is essential
to good hitch performance and service life. Failure
to perform the maintenance procedures can lead to
poor hitch performance and component damage.
Required maintenance procedures and additional
hitch information is available in the
Atwood Model MPD84132 Surge Brake System
Operation/Maintenance Manual
(Atwood part number MPD85778) OR the
Demco Model 91 Brake Actuators
Owner/Operator Manual
(Demco part number BH20023).
Atwood Model MPD84132 Owner/Operator Manual
Genie part number
97403
Demco Model 91 Owner/Operator Manual
Genie part number
84592
800-610-4101
ActionRental.com