© 2019 Genesis Attachments, LLC
Genesis GVP 07 19
HYDRAULIC START-UP
The Genesis Versi Pro 07 Processor is designed to operate up to 3650 PSI. Due to these high
pressures, it is important that air is bled from the attachment cylinder after installation. Failure to
follow these procedures could result in cylinder seal damage and/or base machine hydraulic sys-
tem damage.
Start-up Procedure:
3
Check the base machine hydraulic reservoir for proper fluid level.
3
The base machine hydraulic oil should be warmed up per the OEM procedures before
hooking up the attachment.
3
3
Follow the OEM procedures for starting and warming in cold weather. Do not operate the
attachment circuit during the warm-up period.
3
After the base machine has reached normal operating temperature, set the engine to idle
speed.
3
Attachment must be vertical to bleed air from the cylinder.
3
Slowly fill the bore end of the attachment cylinder to partially close the jaws. Do not allow
the tank to run low - have someone watch the oil level gauge.
3
Slowly fill the rod end of the attachment cylinder to open the jaws. Use partial strokes ex
-
tending and retracting, slowly working to full strokes.
3
Stop and check the base machine hydraulic fluid level again to be sure there is still suf
-
ficient fluid. Fill the reservoir as needed. Note: hydraulic fluid level should be checked with
the attachment jaws open (cylinder retracted).
3
Cycle the jaws five or six strokes before increasing to full operating pressure.
Do not fully extend or retract attachment cylinder with the
first cycles.
NOTICE