background image

 

 

GENEREX SYSTEMS Computervertriebsgesellschaft mbH - www.generex.de -   27  

GENEREX Systems Inc. -  www.generex.us      

Connection Diagram for the WEBMANAGER 

5. Activating the  
   Operating Mode 

 

This  step  is  only  necessary  if  you  are  running  the 

webmanager

  in  configuration  mode.  If  the  sliding 

switch is in the correct position you may just need to 
check  if  the  IP  address  is  correct  and  the  BACS 

webmanager

 shows login dialog as expected. 

 

1. 

Remove  the  power  supply  from  the 

WEBMANAGER

For the slot versions, pull the card out of the slot of your 
UPS.

 

 

2. 

To  switch  the 

WEBMANAGER

  to  operating  mode, 

                           

        „

left position

“: 

manual IP

 

           „

right position

“: 

IP via DHCP

 

 

3.  Connect the 

WEBMANAGER

 to the power supply. After 

the boot process, the adapter is accessible on the confi-
gured IP address. 

 

After about 2 minutes, the boot process is complete 
and the web manager can be reached via the confi-
gured IP address. 
 

Note:

 If you are running your adapter in DHCP mo-

de, this step is omitted. 

 
 

Sliding switch to left 

EU: 230V AC / 12 V DC 
US: 120V AC / 12V DC 

Содержание BACS System

Страница 1: ...Components BACS Measuring Cable BACS Bus Cable BACS Module BACS WEBMANAGER CS141 SNMP Adapter Professional BACS Bus Converter BACSKIT_BSC4 Slot Version BACSKIT_LB4 External Box CS141 SNMP Adapter MODB...

Страница 2: ...with EN 50272 2 2001 Safety Re quirements for Secondary Batteries and Battery Installations Part 2 Stationary Batteries IEEE Standard 450 2002 Recommended Practice for Maintenance Testing and Replace...

Страница 3: ...s after a discharge period BACS modules must NOT be mounted on a damaged battery If a battery is damaged and its internal resistance is high charging current or current being discharged may follow the...

Страница 4: ...time frame for reaction to alarms BACS is a tool designed to increase the durability of accumulators but its most important function is to monitor the battery in order to avoid breakdowns For this rea...

Страница 5: ...ry the surface of the ac cumulator with an antistatic fabric 1 2 Installation BACS Measuring Cables Please follow the installation diagrams on the next pages to mount the cables correctly to the batte...

Страница 6: ...BACS test lead to all poles Note If the battery has more than 4 poles it is sufficient to connect the BACS cable to four battery poles Use the same poles at each battery Note Please refer to the batte...

Страница 7: ...Order No BACSC23 Order No BACSC30 Order No BACSC40 Order No BACSC41 Order No BACSC50 As standards BACS modules are equipped with integrated temperature Optional you can get the Module with an externa...

Страница 8: ...cooling ribs or plugs Wet cells For wet cells and low maintenance batteries ensure a clearance to the breather of at least 10 cm 3 94in BACS Modules with external temperature sensors Instead of the i...

Страница 9: ...e Velcro strips 2 Mounting the BACS module Position the BACS module press it firmly with your thumb under high pressure and hold the pressure for about 5 10 seconds Connecting BCx Measuring Cable to t...

Страница 10: ...maximum of 50 connected modules The modules can be connected to the bus in any order It is not necessary to connect the modules of the addresses in sequence Connection to the BACS WEBMA NAGER BACS Bus...

Страница 11: ...4 Max cable length from BACS WEBMANAGER to BACS SPLITTING BOX should not exceed 10m 395in Otherwise it will reduce the max length of 6 5 The cable length of the connection between the BACS SPLITTING...

Страница 12: ...en the distance of 50m 1970in 8 Max number of BACS Modules is 512 9 Max distance from BACS WEBMANAGER to BACS CURRENT SENSORs should not exceed 10m 395in 10 Max distance between the BACS_GX_R_AUX and...

Страница 13: ...ER MODBUS RS485 CS141SCM Slot external BACS Bus Converter Order No BACSKIT_SCMB4 SNMP WEB MANAGER MODBUS RS485 CS141LM external external BACS Bus Converter Order No BACSKIT_LMB4 The BACS Bus Converter...

Страница 14: ...generex us Wiring instruction BACS WEBMANAGER BACS WEBMANAGER BACS Kit Box with external BACS Bus Converter BACS Bus cables Power Supply BACS BUS Special cable RJ12 BACS BUS Power Supply Power Supply...

Страница 15: ...allows an optimized star shaped bus cabling instal lation It is possible to connect more BACS SPLIT TING BOX at one BACS System Distribute all BACS modules equally to the ports of the SPLITTING BOX E...

Страница 16: ...Converter BACS Buskabel BACS Bus cable BACS WEBMANAGER Budget with BACS SPLITTING BOX Installation of the BACS hardware complete For operational mode the BACS modules need to be configured BACS Bus ca...

Страница 17: ...12 6pole cable 6 LEDs red green Operation Status WEBMANAGER Red LED Green LED No Power OFF OFF Booting ON OFF Update in progress flashing slowly OFF Update failure flashing fast OFF UPS Communication...

Страница 18: ...PS cable to the COM1 port of the web manager Connecting the BACS WEBMANAGER directly with a UPS system is an additional feature BACS will run without it too when using a BACS WEBMANAGER Slot card vers...

Страница 19: ...141 snmp 2 4 Run the Setup Wizard On very first login the Webmanager will start a tool that will help you with the basic configuration System Setup Wizard The Setup Wizard will guide you through the m...

Страница 20: ...f you want to use BACS only select No UPS model defined 3 4 Press Apply to save your settings Configure the local system time The time is important for accurate event logging 1 Under System go to Date...

Страница 21: ...pply or insert the slot card into the according slot of the UPS 4 Connect the Webmanager to your local network The UPS will continue running as expected Remo ving the power supply from the external CS...

Страница 22: ...they are connected to the measuring cable They wake up automatically if the BACS WEBMANAGER BACS Programmer or BACS Reader sends request To wake up the modules it s necessary to activate bus communic...

Страница 23: ...er tap using a configuration like that you need to setup your BACS system according to it To handle different power circuits your BACS confi guration needs for each power circuit an indepen dent strin...

Страница 24: ...earch Tool Find BACS modules by address 4 2 1 Addressing BACS Modules via Automatic Mode Automatic mode allows automatic addressing of modules After each successful addressing an address is automatica...

Страница 25: ...can also press and hold the button on the relevant BACS module for about 10 se conds to reset the module to the delivery state With C20 HW 3 x FW 3 4 1 and C30 C40 HW 3 x from FW 3 4 2 this BACS modu...

Страница 26: ...to provide the replacement of broken mo dules as well as adding one single module to the existing configuration Please Ensure only one module is connected to your Manager Entering address Under Old en...

Страница 27: ...dialog as expected 1 Remove the power supply from the WEBMANAGER For the slot versions pull the card out of the slot of your UPS 2 To switch the WEBMANAGER to operating mode left position manual IP ri...

Страница 28: ...ccessful initialization the BACS status page will be displayed with the voltage and temperature of the batteries the equalization power and the status of the LEDs After approximately 15 minutes the fi...

Отзывы: