Operation

 

 

Failure to do so may result in damage to cer-
tain rotary equipment.

5. 

When certain that UTILITY supply voltage is correct and compat-
ible with transfer switch ratings, turn OFF the UTILITY supply to 
the transfer switch.

6.  Set the generator’s main circuit breaker (CB1) to its OFF or 

OPEN position.

7.  On the generator panel, select the OFF mode to shut down the 

generator.

NOTE:

Do NOT proceed until generator AC output voltage and frequency 
are correct and within stated limits. If the no-load voltage is 
correct but no-load frequency is incorrect, the engine governed 
speed probably requires adjustment. If no-load frequency is 
correct but voltage is not, the voltage regulator may require 
adjustment.

3.4 

GENERATOR TESTS UNDER LOAD

1. 

Set the generator's main circuit breaker to its OFF or OPEN posi-
tion.

2. 

Manually actuate the transfer switch main contacts to their emer-
gency (Standby) position. Refer to “Manual Operation”.

3.  To start the generator, select the MANUAL mode or operation. 

When engine starts, let it stabilize for a few minutes.

4.  Turn the generator's main circuit breaker to the ON or CLOSED 

position. The generator now powers all LOAD circuits. Check 
generator operation under load as follows:

•   Turn ON electrical loads to the full rated wattage/amperage 

capacity of the generator. DO NOT OVERLOAD.

•   With maximum rated load applied, check voltage and fre-

quency across transfer switch terminals E1 and E2. Voltage 

should be greater than 230 volts (240VAC system); fre-

quency should be greater than 59 Hz.

•    Let the generator run under rated load for at least 30 minutes. 

With unit running, listen for unusual noises, vibration, over-

heating, etc., that might indicate a problem.

5.   When checkout under load is complete, set main circuit breaker 

of the generator to the OFF or OPEN position.

6.   Let the generator run at no-load for several minutes. Then, shut 

down by selecting the OFF mode.

7.   Move the switch's main contacts back to the UTILITY position. 

For example, load connected to utility power supply. Refer to 
“Manual Operation”. Handle and operating lever of transfer switch 
should be in down position.

8. 

 Turn on the utility power supply to transfer switch, using whatever 
means provided (such as a utility main line circuit breaker). The 
utility power source now powers the loads.

9.   Select the generator's OFF mode to shut down the generator. 

The system is now set for fully automatic operation.

3.5 CHECKING 

AUTOMATIC 

OPERATION

To check the system for proper automatic operation, proceed as fol-
lows:

1.  Ensure that the generator is in it’s OFF mode.
2.  Install front cover of the transfer switch.
3.  Turn ON the utility power supply to the transfer switch, using the 

means provided (such as a utility main line circuit breaker).

NOTE:

Transfer Switch will transfer back to utility position.

4.  Set the generator’s main circuit breaker to its ON (or CLOSED) 

position.

5.  On the generator panel, select the AUTO mode. The system is 

now ready for automatic operation.

6.  Turn OFF the utility power supply to the transfer switch.
With the generator ready for automatic operation, the engine should 
crank and start when the utility source power is turned OFF after a 10 
second delay (factory default setting). After starting, the transfer switch 
should connect load circuits to the standby side after a five (5) second 
delay. Let the system operate through its entire automatic sequence 
of operation.

3.6 

 TESTING OVERLOAD PREVENTION 
CONTROL BOARD (OPCB)

A Test push-button is provided on the bottom of the OPCB to test the 
operation of the load shed functions. The Test button will work when 
the ATS is in the Utility or the Generator position. 

1.  Turn the Utility supply on to the ATS.
2.  Press the TEST push-button on the OPCB.
3.  Verify that all of the connected loads to be “shed” become dis-

abled. The method of verification will depend on the type of load.

4.  After five (5) minutes verify AC 1 and Load 1 are energized 

Status LED AC 1 and Load 1 is ON.

5.  After another 15 seconds, verify AC 2 and Load 2 are energized 

Status LED AC 2 and Load 2 are ON.

6. 

After another 15 seconds, verify Load 3 is energized Status Load 
3 is ON.

7. 

After another 15 seconds, verify Load 4 is energized Status Load 
4 is ON.

Содержание RTSR600A3

Страница 1: ...remain with the unit Owner s Manual 600 800 Amp Automatic Transfer Switch NOT INTENDED FOR USE IN CRITICAL LIFE SUPPORT APPLICATIONS DEADLY EXHAUST FUMES OUTDOOR INSTALLATION ONLY Reference all approp...

Страница 2: ...ents 7 3 2 Manual Operation 7 3 3 Voltage Checks 8 3 4 Generator Tests Under Load 9 3 5 Checking Automatic Operation 9 3 6 Testing Overload Prevention Control Board OPCB 9 3 7 Installation Summary 10...

Страница 3: ...tly complied with may result in damage to equipment and or property These safety warnings cannot eliminate the hazards that they indicate Common sense and strict compliance with the special instructio...

Страница 4: ...transfer switch is used for transferring critical electrical loads from a UTILITY NORMAL power source to an EMERGENCY GNERATOR power source The transfer switch prevents electrical feedback between th...

Страница 5: ...efully Comply strictly with all SAFETY RULES to prevent accidents and or damage to the equip ment The manufacturer recommends that a copy of the SAFETY RULES are posted near the transfer switch Also b...

Страница 6: ...n the decal located on the inside of the door After tightening terminal lugs carefully wipe away any excess corrosion inhibitor All power cables should enter the switch next to the transfer mecha nism...

Страница 7: ...grommet is provided to route Class 2 wiring through The grommet can be used in any knockout for NEMA 1 installations The grommet can only be used in the bottom knockouts for NEMA 3R installations Cont...

Страница 8: ...a class 2 transformer that can be purchased from the manufacturer Mounting holes are provided in the enclosure subplate for mounting of the transformer The 120 VAC supply is fused at 5 amps and is fa...

Страница 9: ...switch Manual opera tion must be checked BEFORE the transfer switch is operated electri cally To check manual operation proceed as follows 1 Ensure the generator is in the OFF mode 2 Turn OFF or OPEN...

Страница 10: ...at UTILITY supply voltage is correct and compat ible with transfer switch ratings turn OFF the UTILITY supply to the transfer switch 3 3 2 GENERATOR VOLTAGE CHECKS 1 On the generator panel select the...

Страница 11: ...tility power supply Refer to Manual Operation Handle and operating lever of transfer switch should be in down position 8 Turn on the utility power supply to transfer switch using whatever means provid...

Страница 12: ...k into AUTO and allow to start and warm up for a few minutes 2 Turn ON or CLOSE the MLCB on the generator The system will now be operating in its automatic mode The main utility disconnect can be turn...

Страница 13: ...H3797A F 0 F 7 8 0 7 B S 1 0 3 2 X 5 1 6 0 H 3 7 9 7 B S 3 8 16 LH 64101 S 3 8X16 0F7807C S 0 5 0 2 9 9 E S 0 H 3 7 9 7 B S 0H3797A F 0 D 2 9 0 8 S M 4 X 1 5 S T U D 0H3797A F 0 F 7 8 0 7 B S 1 0 3 2...

Страница 14: ...7 T M4X10STUD T M 4 X 1 2 S T U D T M 4 X 1 2 S T U D T 0C8112A T M6X20 0F7808 S M8X35 PEM STUD 0D2907 S M4X10STUD 0F5782 T M5X25STUD 0F5782 T M5X25STUD 0 F 5 7 8 2 T M 5 X 2 5 S T U D 0F5782 T M5X25S...

Страница 15: ...M8X35 PEM STUD 0F7808 T M8X35 PEM STUD 0F7808 T M8X35 PEM STUD 0F7808 T M8X35 PEM STUD 0F7808 T 0 D 2 9 0 7 T M 4 X 1 0 S T U D T 0 D 2 9 0 7 T M 4 X 1 0 S T U D T 0 D 2 9 0 7 T M 4 X 1 0 S T U D T 0...

Страница 16: ...Part No 0K2013 Revision D 01 03 14 Printed in U S A...

Страница 17: ...etario Interruptor de transferencia autom tica de 600 800 A PELIGRO NO EST N DESTINADOS AL USO EN APLICACIONES CR TICAS DE SOPORTE A LA VIDA HUMANA EMANACIONES DE ESCAPE MORTALES SOLO PARA INSTALACI N...

Страница 18: ...Contactos auxiliares 23 Funcionamiento 23 3 1 Pruebas y ajustes de funcionamiento 23 3 2 Operaci n manual 23 3 3 Comprobaciones de voltaje 24 3 4 Pruebas del generador bajo carga 25 3 5 Comprobaci n...

Страница 19: ...tamente pueden resultar en da os al equipo y o a la propiedad Estas advertencias de seguridad no pueden eliminar los peligros que indican El sentido com n y el cumplimiento estricto de las instruccion...

Страница 20: ...VICIO P BLICO NORMAL a una de EMERGENCIA GENERADOR El interruptor de transferencia evita la realimentaci n el ctrica entre las fuentes de SERVICIO P BLICO y EMERGENCIA Por esta raz n los c digos el ct...

Страница 21: ...D cerca del interruptor de transferencia Tambi n aseg rese de leer todas las instrucciones e infor maci n que se encuentra en los r tulos etiquetas y etiquetas adhesivas adheridos al equipo Las siguie...

Страница 22: ...la eti queta adhesiva ubicada en el interior de la puerta Luego de ajustar los terminales limpie cuidadosamente cualquier excedente de inhibidor de corrosi n Todos los cables de alimentaci n deben in...

Страница 23: ...para hacer las conexiones de la bobina del contactor en el m dulo PMM Vea la Figura 2 1 Se provee un ojal a trav s del cual se pasa el cableado Clase 2 El ojal se puede usar en cualquier perforaci n d...

Страница 24: ...e 2 que se puede comprar al fabricante La subplaca del gabinete cuenta con agujeros de montaje para montar el transformador El suministro de 120 VCA tiene un fusible de 5 A y se conecta en la f brica...

Страница 25: ...rincipal Junto con el interruptor de transferencia se env a una MANIJA manual La operaci n manual debe ser comprobada ANTES de que el interruptor de transferencia sea accionado el ctricamente Para com...

Страница 26: ...ue en OFF la ali mentaci n de SERVICIO P BLICO al interruptor de transferencia 3 3 2 COMPROBACIONES DE VOLTAJE DEL GENERADOR 1 En el tablero del generador seleccione el modo de funcionamiento MANUAL E...

Страница 27: ...o OFF 7 Mueva los contactos principales del interruptor de vuelta a la posici n de SERVICIO P BLICO Por ejemplo carga conectada a la fuente de alimentaci n del servicio p blico Consulte Operaci n manu...

Страница 28: ...p blico 2 Coloque en OFF o ABIERTO el disyuntor principal de l nea MLCB en el generador 3 Coloque el generador en OFF Para encender el generador nuevamente 1 Coloque el generador de vuelta en AUTO y p...

Страница 29: ...27 Notas...

Страница 30: ...Pieza N m 0K2013 Revisi n D 03 01 14 Impreso en EE UU...

Страница 31: ...du propri taire Commutateur de transfert automatique 600 800 A DANGER NON DESTIN DES UTILISATIONS DE MAINTIEN DES FONCTIONS VITALES CRITIQUES GAZ D CHAPPEMENT MORTELS INSTALLER L EXT RIEUR SEULEMENT C...

Страница 32: ...fonctionnement et r glages 37 3 2 Fonctionnement manuel 37 3 3 V rification de la tension 38 3 4 V rifications du g n rateur avec charge 39 3 5 V rification du fonctionnement automatique 39 3 6 V rifi...

Страница 33: ...ettre peut mener des dommages l quipement ou aux biens d autrui Ces avertissements en mati re de s curit ne peuvent liminer les dangers qu ils d crivent Pour viter les accidents il est essentiel de fa...

Страница 34: ...AL celle d un syst me DE SECOURS G N RATEUR Le commutateur de transfert emp che toute r alimentation d nergie lectrique pouvant survenir entre la source du R SEAU PUBLIC et la source DE SECOURS C est...

Страница 35: ...exemplaire des R GLES DE S CURIT se trouve prox imit du commutateur de transfert De plus assurez vous d avoir lu toutes les instructions et toute l information des tiquettes et des autocollants qui s...

Страница 36: ...on le couple prescrit par l autocollant situ l int rieur de la porte Apr s avoir serr les bornes retirez soigneu sement tout exc s d antirouille Tous les c bles d alimentation doivent entrer dans le c...

Страница 37: ...ornes connexion rapide de 0 25 po pour connecter la languette de connexion au PMM Voir la figure 2 1 Un illet est pr sent pour acheminer le c blage de Classe 2 L illet peut servir pour toute entr e d...

Страница 38: ...transformateur de Classe 2 qui peut tre achet du fabricant Des trous de montage sont pr sents dans le bo tier pour l installation du transfor mateur L alimentation 120 V c a est associ e un fusible de...

Страница 39: ...urni avec le commutateur de transfert Le fonctionnement manuel doit tre v rifi AVANT que le commutateur de transfert soit aliment Pour v rifier le fonctionnement manuel proc dez de la mani re suivante...

Страница 40: ...ion ARR T pour l alimentation du R SEAU PUBLIC 3 3 2 V RIFICATIONS DE LATENSION DU G N RATEUR 1 Sur le panneau du g n rateur s lectionnez le mode de fonc tionnement MANUEL Le g n rateur devrait se lan...

Страница 41: ...itionnez le disjoncteur principal du g n rateur en position ARR T ou OUVERT 6 Laissez le g n rateur fonctionner sans charge pendant quelques minutes Ensuite teignez en s lectionnant le mode ARR T 7 Pl...

Страница 42: ...ez le g n rateur sur ARR T Pour remettre le g n rateur sur ON 1 Remettez le g n rateur sur le mode AUTO et laissez le d marrer et chauffer pendant quelques minutes 2 Mettez sur MARCHE ou FERM le DLP d...

Страница 43: ...41 Remarques...

Страница 44: ...Pi ce no 0K2013 R vision D 03 01 14 Imprim aux tats Unis...

Страница 45: ......

Страница 46: ...06 1 FUSEBLOCK 30A 600V 2 POS W SQ 26 0D2572 1 FUSEBLOCK 30A 600V 3 POS W SQ 27 073590A 5 FUSE 5A X BUSS 28 0D7393T 1 TERM BLOCK 3P UL 12 20AWG 29 0H7917 1 DECAL CUSTOMER CONN 30 054199 1 DECAL DANGER...

Страница 47: ......

Страница 48: ......

Страница 49: ......

Страница 50: ...SEBLOCK 30A 600V 2 POS W SQ 26 0D2572 1 FUSEBLOCK 30A 600V 3 POS W SQ 27 073590A 5 FUSE 5A X BUSS 28 0D7393T 1 TERM BLOCK 3P UL 12 20AWG 29 0H7917 1 DECAL CUSTOMER CONN 30 054199 1 DECAL DANGER HIGH V...

Страница 51: ......

Страница 52: ......

Отзывы: