Generac Power Systems PowerManager 004975-2 Скачать руководство пользователя страница 11

 

 

9

3.8  

COMMUNICATIONS – PM-SC 
TO GENLINK

The PM-SC has two RS232 ports to permit remote monitoring and 

programming. These ports also use the Modbus RTU protocol and 

can communicate with GenLink software or with any compatible 

software. For example, a building management package could be 

used to talk to the PM-SC. When the “GenLink” RS232 port is not 

connected locally (to a PC for programming), an internal circuit 

connects its signal lines to the internal modem. This allows off site 

monitoring and programming of both the PM-SC and the individual 

generator sets via a standard telephone line.
GenLink can show both an overview (mimic) of what the system is 

doing, and can also “drill down” to monitor an individual generator 

set. GenLink can be used in this way to change the standard gen-

erator parameters such as setpoints for alarms, etc. The PM-SC 

appears transparent to GenLink when used in this fashion - it 

appears as though you are using the standard GenLink package 

hooked up to a single generator.
The GenLink mimic diagram shows all the generator sets that are 

hooked up to the system and their power distribution. It shows 

which sets are operating and the states of their contactors (wheth-

er they are running in parallel, etc.). 

3.9 COMMUNICATION 

ISSUES?

Normally communication problems can be resolved with the help 

of either the Genlink or Touchscreen com port diagnostic displays 

– see Figures 3.7 and 3.8. Select the diagnostic display then 

change the port to the port number of interest. The display now 

shows if data is being received or not via status led’s (or check 

boxes for Genlink). If no data is being received then suspect the 

wiring or the downstream port setup (the slave). The port setup 

is displayed in the function and baud rate lines and these should 

match the slave setup. Normally each generator is set as a mod-

bus slave and the PM-SC is set as a master, also you should check 

you have the correct slave address setup in both the generators 

and PM-SC. Each generator should have a unique slave address 

and this should be entered into the generator settings page. If data 

is being received but is not understood by the PM-SC then the 

status line will indicate this as the requests received total will not 

count up. This is usually caused by an incorrect setup of the func-

tion or baud rate data.

Figure 3.7 — Com Port Diagnostics

Figure 3.8 — Port Number of Interest

3.10 RELAY FUNCTIONALITY

Several function relays are provided for customer connection via 

terminal strips. These relays provide the following signals:
1. Permissive 

1

2. Permissive 

2

3. Permissive 

3

4.  Load Shed 1
5.  Load Shed 2
6.  Load Shed 3
7.  All generators online status
8.  Exercise with transfer

Operation

Содержание PowerManager 004975-2

Страница 1: ...MA 1 Enclosure Model 005039 1 NEMA 3R Enclosure Model 005047 1 NEMA 3R Enclosure with Heater PowerManager System Controller PM SC nOnly qualified electricians or contractors should attempt installatio...

Страница 2: ...munication Issues 9 3 10 Relay Functionality 9 3 11 Backup Modes of Operation 10 3 11 1 Introduction 10 3 11 2 Abbreviations 10 3 11 3 Documents 10 3 11 4 Standard Control System 10 3 11 5 Normal MPS...

Страница 3: ...az ard This symbol points out potential fire hazard This symbol points out potential electrical shock hazard The operator is responsible for proper and safe use of the equip ment The manufacturer stro...

Страница 4: ...Never work on the equipment when physically or mentally fatigued Inspect the generator s regularly and repair or replace all damaged or defective parts immediately Always use factory authorized parts...

Страница 5: ...to local state and national electrical and building codes Comply with regulations the Occupational Safety and Health Administration OSHA has established Also ensure that the generator s is installed...

Страница 6: ...ets with different power ratings Real time clock and calendar included user programmable to set exercisers based on date and time of day Monitoring set up of parameters and commands using New Generati...

Страница 7: ...the PC as well as Genlink this is supplied with the converter box Use the re direction software to select an unused port on your PC that will be re directed to the PC s LAN connection for example com...

Страница 8: ...ot set a leading power factor 3 1 7 SLAVE ADDRESS This is the Modbus slave ID of the generator and must correspond to the Modbus ID setting in the corresponding PM PC control panel Set all the paramet...

Страница 9: ...The base load can be programmed into the Kw setting field The power factor is fixed at 1 00 for exercise and cannot be adjusted 3 2 2 KW AND POWER FACTOR LIMITS These settings are only used to set up...

Страница 10: ...ecking any box Gen1 through 10 tells the system that the checked generator s has been intentionally taken out of service for example for maintenance The PM SC will then not expect that generator to st...

Страница 11: ...TION ISSUES Normally communication problems can be resolved with the help of either the Genlink or Touchscreen com port diagnostic displays see Figures 3 7 and 3 8 Select the diagnostic display then c...

Страница 12: ...g the generators to the bus proportion ally share load across all connected generators disconnect the generators from the Bus and shut the generators down The PM SC also accumulates data from the gene...

Страница 13: ...e for Enabling Manual Backup Operation Using GenLink connect to the PM SC Open the Configuration pull down menu and select Regulator Settings Figure 3 10 Figure 3 10 Regular Settings In the lower left...

Страница 14: ...Status After all the running generators are connected to the Bus the operator must determine what generator power is available and what the load requirements are If there is enough power available for...

Страница 15: ...procedure Go to each generator in the MPS that is in the MANUAL mode and using the generator touch screen main menu select the Diagnostics page Figure 3 17 Figure 3 17 Diagnostics Press the Cancel MA...

Страница 16: ...eration is available with PM PC and PM SC firmware version 2 2H or later Figure 3 20 The automatic backup operation consists of the normal MPS operation with the added ability of each generator PM PC...

Страница 17: ...er is available and what the maximum power needs are If there is enough power available for a given permissive to be active the PM PLS will activate the appropriate permissive signals If a generator s...

Страница 18: ...ch requests When the keyswitch is in the MAN position the PM SC will start the genera tors as though a two wire remote start had been issued This is to allow the system to be activated in the event th...

Страница 19: ...lax errors EITHER 1 Switch on the power to the unit 2 During the initialization phase a menu will appear briefly Press the CONFIG button 3 Now use the CALIBRATE button to calibrate the screen 4 Five c...

Страница 20: ...th the circuit diagram You should refer to this diagram to see that the correct input has operated Outputs from the controller are generally open collector This means that they sink current through a...

Страница 21: ...for customer use 5 User assigned 5 Free for customer use 6 User assigned 6 Free for customer use 7 Auto Led On Front Panel Led 8 User assigned 8 Free for customer use 9 Fault Led On Front Panel Led 1...

Страница 22: ...4 20ma User config channel 12 13 4 20ma User config channel 13 14 4 20ma User config channel 14 15 4 20ma User config channel 15 16 4 20ma User config channel 16 17 4 20ma User config channel 17 18 B...

Страница 23: ...E4086 in the back of this manual 1 Ensure that utility power is OFF at this point 2 Connect 18AWG or heavier double insulated wire fused at the source to terminals TB2 1 2 3 in the PM SC and run this...

Страница 24: ...tween generators should only have one end of the shield connected 7 Connect the standard telephone jack to a telephone line using an RJ 11 type cable 8 If an optional Annunciator is to be used connect...

Страница 25: ...23 Notes...

Страница 26: ...24 Notes...

Страница 27: ...25 Notes...

Страница 28: ...26 Installation Diagrams NEMA 1 Drawing No 0E7619 C...

Страница 29: ...27 NEMA 1 Drawing No 0E7619 C Installation Diagrams...

Страница 30: ...28 Installation Diagrams NEMA 3R Drawing No 0H3175 A...

Страница 31: ...29 NEMA 3R Drawing No 0H3175 A Installation Diagrams...

Страница 32: ...Parts shipment costs are reimbursed at ground shipment rates Costs related to requests for expedited shipping will be the responsibility of the customer 11 Verification of required maintenance may be...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ......

Страница 46: ...1 DECAL 24V SUPPLY 44 0E7438 1 DECAL POWER MANAGER SC TB6 45 062684 1 LUG SLDLSS 2 0 12 X 11 32 CU 46 067210A 1 DECAL GROUND LUG 47 091472 FT DUCT WIRING 1X1 5 6 FT 48 091472A FT COVER WIRE DUCT 1 IN...

Страница 47: ......

Страница 48: ......

Отзывы: