 12 

5.  When certain that input voltage is compatible with battery 

charger ratings, turn OFF the power supply to the generator.

6.  On the generator panel, set the Auto/Off/ Manual switch to 

MANUAL. The engine should crank and start.

7.  Let the engine warm up for about five minutes to allow inter-

nal temperatures to stabilize. Then, set the generator’s main 

circuit breaker to its ON (or closed) position.

 Proceed with caution! Generator power volt-

age is now supplied to the inverter. Contact 

with live inverter parts will result in danger-

ous and possibly fatal electrical shock.

8.  Connect the AC voltmeter test leads across terminal lugs E1 

and neutral. Voltage reading should be 125-120 volts AC.

9.  Set the generator’s main circuit breaker to its OFF (or OPEN) 

position. Let the engine run at no-load for a few minutes to 

stabilize internal engine generator temperatures.

10.  Set the generator's AUTO/OFF/MANUAL switch to OFF. The 

engine should shut down.

NOTE:

It is important not to proceed until certain that generator AC 

voltage and frequency are correct and within the stated limits.

2.4  

GENERATOR TESTS UNDER 
LOAD

To test the generator set with electrical loads applied, proceed as 

follows:
1.  Set generator’s main circuit breaker to its OFF (or OPEN) posi-

tion.

2.  Turn OFF all breakers on the load center of the inverter (if 

equipped).

3.  Set the generator's AUTO/OFF/MANUAL switch to MANUAL. 

The engine should crank and start immediately.

4.  Let the engine stabilize and warm up for a few minutes.
5.  Set the generator’s main circuit breaker to its ON (or CLOSED) 

position. The inverter is now powered by the standby genera-

tor.

6.  Turn ON the load center of the inverter system.
7.  Connect an accurate AC voltmeter and a frequency meter 

across terminal lugs at the inverter.

Voltage should be greater than 120 volts and frequency 

• 

should be 60 Hz.

8.  Let the generator run at full rated load for 20-30 minutes. 

Listen for unusual noises, vibration or other indications of 

abnormal operation. Check for oil leaks, evidence of overheat-

ing, etc.

9.  When testing under load is complete, turn OFF electrical 

loads.

10.  Set the generator's main circuit breaker to its OFF (or OPEN) 

position.

11.  Let the engine run at no-load for a few minutes.
12.  Set the AUTO/OFF/MANUAL switch to OFF. The engine should 

shut down.

2.5  

CHECKING AUTOMATIC 
OPERATION

To check the system for proper automatic operation, proceed as 

follows:
1.  Set generator’s main circuit breaker to its OFF (or OPEN) posi-

tion.

2.  Check that the AUTO/OFF/MANUAL switch is set to OFF.
5.  Turn ON the power supply to the battery charger, using the 

means provided (such as a line circuit breaker).

6.  Set the generator's main circuit breaker to its ON (or CLOSED) 

position.

7.  Set the AUTO/OFF/MANUAL switch to AUTO. The system is 

now ready for automatic operation.

8.  Close or connect Remote 2-wire Start with a test switch 

installed at the inverter.

With the AUTO/OFF/MANUAL switch at AUTO, the engine should 

crank and start when the remote start contact switch is closed. 

Let the system go through its entire automatic sequence of opera-

tion.
With the generator running and loads powered by generator AC 

output, and the remote start contacts OPEN. The following should 

occur:

About one minute after remote start contacts OPEN (OFF) the 

• 

engine should shut down.

3.1  CONTROL PANEL INTERFACE

3.1.1 

 USING THE AUTO/OFF/MANUAL SWITCH 

(FIGURE 3.1)

n

 

With the switch set to AUTO, the engine may 

crank and start at any time without warning. 

Such automatic starting occurs when utility 

power source voltage droops below a preset 

level or during the normal exercise cycle. To 

prevent possible injury that might be caused 

by such sudden starts, always set the switch 

to OFF and remove the fuses before work-

ing on or around the generator or transfer 

switch. Then, place a “DO NOT OPERATE” 

tag on the generator panel and on the trans-

fer switch.

1.  “AUTO” Position – Selecting this switch activates fully auto-

matic system operation.

2.  “OFF” Position – This switch position shuts down the engine. 

This position also prevents automatic operation.

3.  “MANUAL” Position – Set the switch to MANUAL to crank 

and start the engine. Transfer to standby power will not occur 

unless there is a utility failure.

Operation

Содержание EcoGen 6kW

Страница 1: ...enerator Owner s Manual LISTED C US NOT INTENDED FOR USE IN CRITICAL LIFE SUPPORT APPLICATIONS ONLY QUALIFIED ELECTRICIANS OR CONTRACTORS SHOULD ATTEMPT INSTALLATION DEADLY EXHAUST FUMES OUTDOOR INSTA...

Страница 2: ...3 Electrical Checks 10 2 4 Generator Tests Under Load 12 2 5 Checking Automatic Operation 12 Operation 12 3 1 Control Panel Interface 12 3 2 Automatic Operation 13 3 3 Sequence of Automatic Operation...

Страница 3: ...mation each indicates is as follows nThis symbol points out important safety information that if not followed could endanger personal safety and or property of others This symbol points out potential...

Страница 4: ...to correct generator operation Do not alter the instal lation or permit even partial blockage of ventilation provisions as this can seriously affect safe operation of the generator The generator MUST...

Страница 5: ...e Consult the local fire department with any ques tions pertaining to fire extinguishers EXPLOSION HAZARDS Do not smoke around the generator Wipe up any fuel or oil spills immediately Ensure that no c...

Страница 6: ...tions For that reason the engine is equipped with the fol lowing systems that protect it against potentially damaging condi tions 1 Low Oil Pressure Sensor 6 Low Battery 2 High Temperature Sensor 7 Un...

Страница 7: ...rs 1 5 2 ENGINE Type of Engine GT 530 Number of Cylinders 2 Rated Horsepower 3 600 rpm 18 Displacement 530cc Cylinder Block Aluminum w Cast Iron Sleeve Valve Arrangement Overhead Valves Ignition Syste...

Страница 8: ...es determine the proper location 1 9 LOCATION nThe engine exhaust fumes contain carbon monoxide which can be DEADLY This dan gerous gas if breathed in sufficient con centrations can cause unconsciousn...

Страница 9: ...the enclosure Annex A Explanatory Material A4 1 4 2 Means of demonstrating compliance are by means of full scale fire test or by calculation procedures Because of the limited spaces that are frequentl...

Страница 10: ...of vegetation Clearance at the top should be a minimum of 48 inches from any structure overhang or projections from the wall The generator should not be placed under a deck or other structure that is...

Страница 11: ...erator con trol panel Remove watches rings or other metal objects Use tools with insulated handles Wear rubber gloves and boots Do not lay tools or metal parts on top of the battery Disconnect chargin...

Страница 12: ...INITIAL START UP NOTE These units have been run and tested at the factory prior to being shipped and do not require any type of break in NOTE This unit comes filled with oil from the factory Check the...

Страница 13: ...Use ARROW keys to scroll and find the first number of your Activation Code Press ENTER to select Repeat this step until all digits have been entered Use ESCAPE to correct previous digits Display Read...

Страница 14: ...vidence of overheat ing etc 9 When testing under load is complete turn OFF electrical loads 10 Set the generator s main circuit breaker to its OFF or OPEN position 11 Let the engine run at no load for...

Страница 15: ...menu is reached This page displays the following options HISTORY STATUS EDIT AND DEBUG See the Appendix Menu System 3 2 AUTOMATIC OPERATION To select automatic operation do the following 1 Make sure t...

Страница 16: ...stops immediately 11 During Auto mode cranking if the remote start contacts OPEN OFF the cranking cycle does NOT abort but continues until complete Once the engine starts it will run for one 1 min ute...

Страница 17: ...shut down The under frequency setting is 55 Hz Internal Fault Shutdown Alarm This alarm cannot be cleared call service dealer Undervoltage Shutdown Alarm If the generator voltage falls below 85 of no...

Страница 18: ...ILL ABOVE THE FULL MARK 5 Install the dipstick 6 Reset the AUTO OFF MANUAL switch to its original position 7 If the generator was running first turn the generator s main circuit breaker back to the ON...

Страница 19: ...AUTO position 8 Dispose of used oil at a proper collection center Repeat steps 2 and 3 for the oil reservoir 4 4 CHANGING THE ENGINE AIR CLEANER See The Generator section for the location of the air c...

Страница 20: ...be followed DO NOT SMOKE when near the battery DO NOT cause flame or spark in battery area Discharge static electricity from body before touching the battery by first touching a ground ed metal surfa...

Страница 21: ...er have a Dealer thoroughly clean dry and inspect the generator If the structure ex home has been flooded it should be inspected by a certified electrician to ensure there won t be any electrical prob...

Страница 22: ...erator control panel Start the unit by moving the AUTO OFF MANUAL switch to MANUAL Allow the unit to warm up thoroughly 8 Stop the unit by setting the AUTO OFF MANUAL switch to OFF 9 Turn on the utili...

Страница 23: ...2Y or 500 hours of operation COOLING Enclosure louvers X X W BATTERY Remove corrosion ensure dryness X X M Clean and tighten battery terminals X X M Check charge state X R EVERY 6 M Electrolyte level...

Страница 24: ...k plug s 2 Clean re gap or replace plug s 3 Fuel pressure incorrect 3 Confirm fuel pressure to regulator is 10 12 water column 0 36 0 43 psi for LP 4 Choke remains closed 4 Verify choke solenoid moves...

Страница 25: ...e same navigation method to select the the desired screen refer to the Menu System diagram 6 1 1 CHANGING SETTINGS EDIT MENU To change a setting such as display contrast go to the EDIT menu and use th...

Страница 26: ...E DEBUG INPUTS OUTPUTS DISPLAYS EDIT CONTRAST LANGUAGE TIME DATE EXERCISE TIME SPEED ESC Press the ESCAPE key to jump back up through the menu levels Use the key to navigate through the menu ENTER Use...

Страница 27: ...Generac Power Systems Inc 25 25 Drawing No 0J1320 B Installation Diagram...

Страница 28: ...26 Generac Power Systems Inc 26 Installation Diagram Drawing No 0J1320 B...

Страница 29: ...Generac Power Systems Inc 27 27 Drawing No 0J1320 B Installation Diagram...

Страница 30: ...T BATTERY VOLTAGE SENSING AC DISTRIBUTION PANEL 120 240V DC DISTRIBUTION PANEL 12V 24V 48V BATTERY 12V 24V 48V INVERTER CHARGER GENERATOR HOUSE HOUSE LOADS HOUSE LOADS 120V 240V CHARGER SUPPLY TWO WIR...

Страница 31: ...29 Drawing No 0J1323 C Oil Make up System...

Страница 32: ...30 Notes...

Страница 33: ...31 Notes...

Страница 34: ...ponsible for contacting a Generac Authorized Warranty Dealer as soon as a problem occurs The warranty repairs should be completed in a reasonable amount of time not to exceed 30 days Warranty service...

Страница 35: ...hat part If the part fails prior to the first scheduled replacement the part shall be repaired or replaced by Generac according to Subsection 4 below Any such emissions related part repaired or replac...

Страница 36: ...er service does not normally exist without a renewable energy system including an inverter battery bank and alternative energy power source Fuel connections other than conventional utility company sup...

Отзывы: