GEMAŞ Genel Mühendislik Mekanik San.veTic.A.Ş.
İTOB Organize Sanayi Bölgesi 10001 Sok.No:28 Menderes/İZMİR TURKEY
Tel:0232 799 0 333 Fax:0232 799 0 330 www.gemas.com.tr [email protected]
5
EN
GEMAŞ PURITRON GSC Installation and User Manual
V4.1
2.ASSEMBLY - INSTALLATION
Assembly and installation must be done by authorized service or experienced electrician
and plumber. Otherwise, the manufacturer and the seller cannot be held responsible for
the problems that may arise from incorrect installation and commissioning. Repair,
maintenance and parts replacement cannot be claimed under warranty.
Before starting the assembly, make sure that the following conditions are met by taking the
safety precautions regarding electricity and water for the device to work smoothly and for your life
and property safety.
Electrical Disclosure
Electrical and mechanical measures have been taken to protect the safety of life and
property in the Salt Chlorine Generator. For electrical measures to fulfill their function,
warnings regarding residual current relay and grounding must be taken into account.
Leakage relay:
Use a CE certified residual current relay that you are sure it works. Make sure that the
relay you will use controls the Salt Chlorine Generator. Strictly test the Residual Current Relay every year.
The manufacturer/seller cannot be held responsible for any problems that may arise from
failure of the Leakage Current Relay, subsequent failure, cancellation, not connecting the
grounding cable, and poor grounding.
Supply Cable:
The device supply cable should be at least 3x1.5 mm.
Grounding:
Make sure that the grounding in your facility is well established. Connect the grounding line of
the installation to the device. Test the ground line if necessary. You should see the voltage value you see
between phase and neutral also between phase/ground. The voltage value between neutral and ground
should be at most 2 V AC.
L-N: 220V AC
L-PE: 220V AC N-PE: Maximum 2V AC
Installation Diagram