Fig.6:
Anchoring details
A
Drilled chemical anchor (M20)
B
Grouted anchor recesses (M20)
1
Installed chemical anchor before placing the base frame
2
Installing chemical anchor after placing the base frame (base frame cannot be removed
easily)
3
Drilling angle
1.2.5.3 Mounting the base frame on a concrete block
General
After the space between base frame and concrete base has been filled-up with a
filling grout, the package base frame must be secured tightly to the foundation
block or floor.
INSTALLATION AND PREPARATION FOR USE
INSTALLATION
0089288gbr_11
18
30.10.2017
Содержание Grasso V 1100
Страница 6: ...0089288gbr_11 6 30 10 2017 ...
Страница 8: ...0089288gbr_11 8 30 10 2017 ...
Страница 10: ...0089288gbr_11 10 30 10 2017 ...
Страница 61: ...Fig 16 Grasso V 6 Pre lubrication valve APPENDIX Product Information PI 0089288gbr_11 30 10 2017 61 ...