29
Maintenance
Inspections
Maintenance
Inspections
Between the maintenance periods, the valves must be checked for leakage and proper
function.
Product Contact Seals
Carry out the following steps:
Regularly check:
– Stem seal between upper housing and lantern
– V-ring in the valve disks
– O-rings between teh valve housings
Done.
Pneumatic Connections
Carry out the following steps:
1.
Check the operating pressure at the pressure reducing and filter station.
2.
Clean the air filter at regular intervals.
3.
Check that the air hoses sit firmly in the air connections.
4.
Check the lines for kinks and leaks.
5.
Check the solenoid valves for proper function.
Done.
Electrical Connections
Carry out the following steps:
1.
Check that the cap nut on the cable gland is tight.
2.
Check that the cable onnections are firmly secured.
3.
Check the solenoid valves for proper function.
Done.
Содержание ECOVENT N/W
Страница 1: ...Operating Instructions ECOVENT Valve N W and N M DN 10 15 Edition 2014 07 04 English...
Страница 55: ...55...