Fig.42:
Attach clamping arms
3.
Pull the valve cap against the seal by means of the star grip on the
pressurizing tool (hand-tight).
Fig.43:
Secure internal assembly
4.
Apply max. 3 bar of compressed air to the pressurizing tool.
!
Air pressures > 3 bar can damage the metal bellows.
5.
Immerse the internal assembly in a water bath for approx. 30 seconds.
!
While the internal assembly is immersed, check the internal assembly for
leaks. Leakages will be indicated by air bubbles appearing on the surface.
Maintenance
Carrying out the “Internal Assembly” Leak Test (Bubble Test)
430BAL012727EN_1
48
03.01.2018
Содержание Aseptomag GD
Страница 65: ...Appendix 430BAL012727EN_1 03 01 2018 65...
Страница 66: ......