49-5000431 Rev. 1
Installation Instructions
INST
ALLA
TION INSTRUCTIONS
Install the Drain Pan
NOTE:
7+($&&(6625<'5$,13$1
5$9'30867%(,167$//('
%()25(,167$//,1*7+(81,77KLV
NLWLVRQO\XVHGRQWKH%78XQLWV
ZLWKDFKDVVLVKHLJKWRILQFKHV
,QVWDOOGUDLQSDQ
Refer to instructions included in
WKHGUDLQSDQNLW5$9'3IRU
proper installation procedures.
2. Place unit on the platform and
VOLGHWKHH[WHULRUVLGHRIWKH
unit into the plenum until it is
fully seated and unit touches air
divider in plenum.
$QH[WHUQDORULQWHUQDOGUDLQ
must be attached to one of the
two primary drain connections
located to the right or left side of
WKHGUDLQSDQ7KHGUDLQVSLOOZD\
located on the back of the unit is
the secondary drain if required
by state and local codes. A field
supplied secondary condensation
pan may be required. Refer
to the local codes for proper
installation of drain.
Typical Installation
Plenum
Platform
Wall Plenum
7RS6HDO
Bottom Seal
Pan
5$9'3
'UDLQ3DQ
Shown with condensate
draining to right. Could
also drain to the left.
Platform Surface
inches of
bottom seal
removed to
place drain
pan
Drain Pan Kit
RAVDP20
Содержание Zoneline AZ91H18E E Series
Страница 22: ...22 49 5000431 Rev 1 NOTES Notes...
Страница 48: ...22 49 5000431 Rev 1 NOTES Notes...
Страница 74: ...22 49 5000431 Rev 1 NOTAS Notas...