CHAPTER 3
Installation
Chapter Scope
This chapter covers the installation of the ASLP11 AMC Single Board
Computer in an AMC carrier and initial power-on operations.
Advice
Please observe all safety procedures to avoid damaging system and protect
operators and users.
Unpacking and Handling
Please read the manual carefully before unpacking the module or fitting the
device into your system. Also adhere to the following:
•
Observe all precautions for electrostatic sensitive modules
•
If the product contains batteries, please do not place the board on
conductive surfaces, antistatic plastic, or sponge, which can cause shots
and lead to battery or board trace damage.
•
Please do not exceed the specified operating temperatures. Note that
batteries and storage devices might also have temperature restrictions.
•
Keep all original packaging material for future storage or warranty
shipments of the board.
ESD
Electrostatic Discharge (ESD) is a major cause of electronic component failure.
The ASLP11 has been packed in a static-safe bag which protects the board
from ESD while the board is in the bag. From the time the board is removed
from the antistatic bag until it is properly mounted in a carrier, extreme care
should be taken to avoid damaging board through electrostatic discharges. See
page 23 for details on how to prevent “zapping” the board with ESD.
GE Intelligent Platforms – ASLP11 Hardware Reference Manual, Third Edition
Page 27
Содержание TELUM ASLE11
Страница 10: ......
Страница 19: ...Figure 2 Block diagram GE Intelligent Platforms ASLP11 Hardware Reference Manual Third Edition Page 19 ...
Страница 22: ......
Страница 26: ......
Страница 30: ......
Страница 52: ...GE Intelligent Platforms ASLP11 Hardware Reference Manual Third Edition Page 52 ...
Страница 60: ......
Страница 63: ...GE Intelligent Platforms ASLP11 Hardware Reference Manual Third Edition Page 63 ...