DET-882
SecoGear Medium-voltage Switchgear Application and Technical Guide
Standard SecoGear Construction, Features, and Installation
©2017 General Electric All Rights Reserved
65
Figure 6-31: SecoGear Primary Indoor Anchoring Method
Figure 6-32: SecoGear Alternate Indoor Anchoring Method
Figure 6-33: Installation Top View
Conduit Leads
Embedded Channel
C5 x 6.7# min.
Clearance Space
2Ø 18.0 mm [0.709 in] Holes
for M12 [0.5 in] Anchor
Bolts, Front & Rear
35.05 mm [1.38 in]
25.4 mm [1.0 in] max.
Conduit Leads
Embedded Channel
C5 x 6.7# min.
2Ø 18.0 mm [0.709 in] Holes
for M12 [0.5 in] Anchor
Bolts, Front & Rear
35.05 mm [1.38 in]
25.4 mm [1.0 in] max.
Fr
on
t D
oor
914.4
mm
[36
in]
(r
eq
ui
red
m
in
. s
pac
e
for
re
ar
h
in
ge
d
cov
er
s)
203.2 mm
[8.0 in]
2290.06 mm [90.16 in]
35.05 mm [1.38 in]