LX: OPM_LPA_11U_5K0_10K_1US_V021
16
GE DE LanPro-11U UPS: Installation / User Manual 2.1 (US)
GE Digital Energy
g
For
LanPro
®
-U
8/10kVA:
7.
Install the optional 120Vac Single Phase Kit, art no.
8114001300550, according to fig. 15a
8.
Connect the load wires to the terminals of the Single
Phase Kit, according to fig. 15a.
9.
Connect the ground wire to terminal 5. Ground
connection is essential! See figure 15a.
10. Return to either 4.4.1.1 step 5 or 4.4.1.2 step 5
4.4.4 Input/output voltages: Software modification.
NOTE:
following this procedure you realize that the values shown in the LCD match the the actual
input/output voltages.
1.
Switch on the circuit breakers '
utility
' (8) and '
bypass
' (9) (see also section 5.2, step 1-2)
2.
Go to the setup menu. See 5.3.4 ‘Setup Menu’
3.
Using the push-buttons 'up' and 'down' you can scroll through the several setup screens. 'Enter/reset' confirms
the screen choice. Go to the setup screen 'INPUT VOLTAGE'.
4.
Here you can change the input voltage to 240 Volt. The value of the input voltage blinks. Scroll through its
settings by using the push-buttons 'up' and 'down', the new setting is confirmed by pressing 'enter/reset'.
5.
Go to the setup screen 'OUTPUT VOLTAGE'.
6.
Here you can change the output voltage to 240 Volt. The value of the input voltage blinks. Scroll through its
settings by using the push-buttons 'up' and 'down', the new setting is confirmed by pressing 'enter/reset'.
7.
To return to the default screen scroll to the setup screens first and press 'Enter/reset'. You can also wait 20
seconds: the time-out period of no key activity.
8.
You can now proceed with 5.1 or 5.2.
6(7836&5((16
(17(55(6(7H[LW
,138792/7$*(
9
,138792/7$*(
&+$1*(72
9
28738792/7$*(
9
,138792/7$*(
&+$1*(72
9
Figure 15a. output cable splitting for
8/10kVA 120V 2-wire, using the optional
120Vac Single Phase Kit
1 2 3 4 5 6 7 8
gnd
gnd
L1 L2
gnd
L
N
N